Head of production / sourcing
Owns getting the item made on time, to quality and at an allowable cost, with import and paperwork in order.
About the role
The head of production and sourcing makes sure the item is sewn on time, to the required quality and at an acceptable cost, and that import and documents are in order. The world begins with the tech pack and bill of materials and ends with receiving the batch at the warehouse. The main questions: how much the item costs by specification, which factory offers the best mix of price, time and reliability, whether the minimum batch of fabric and color is enough and how not to break the critical path.
The role includes choosing between a distant and a near production site, quality control (sampling inspection by acceptable quality level), the contract with the factory and responsibility for time and quality, and also import: customs clearance, duty, import VAT and labeling. The head tracks supplier reliability by the share of orders on time and in full (OTIF), by defects and by causes of returns.
For a sourcing head the calendar is the main tool: each day of delay on the critical path shifts the shelf date and shortens the sales season.
A working day
The day begins with the status of orders at factories: where a stage goes to plan, where it lags. Then review of samples and quality: receiving, remarks, batch decisions. In the afternoon the head discusses prices, durations and minimum batches with suppliers, import durations and documents with the broker, payment terms and exchange rate with finance. In the evening checks the collection calendar and the critical path.
Documents: tech packs and specifications, factory commercial offers, supply and production contracts, receiving protocols and discrepancy acts, invoices and packing lists, customs declarations, documents of conformity, labeling codes and their entry into circulation, UPD.
Typical decisions
- Which cost is acceptable by specification and what to do if the calculation exceeds the target.
- Which factory to choose: cheaper, nearer, more reliable, considering OTIF and quality.
- How to cover minimum lots of fabric and color without overbuying.
- What to do if the calendar shows negative slack: compress the path, pay for urgency, move the date.
- How to accept a batch: sample size and acceptable quality level.
- How to build import and labeling into the schedule and who is responsible for codes.
Study path
- The production route: specification, factory, quality, import. Product and production
- The bill of materials and cost from it. Unit cost from the bill of materials
- Cut-make cost: what the factory offer includes. Cut-and-make price from factory minutes (CM)
- The collection life cycle: stages, owners and time overrun. Collection lifecycle and the critical path
- Supplier OTIF and the lead-time stack: reliability in numbers. Supplier OTIF and the lead-time stack
- The collection calendar: critical path and slack to the shelf date. Collection calendar: critical path and slack
- Labeling: the code chain and actions at each import step. Marking and trading leftovers
- Master data: tech pack, colorway and SKU as the basis of order and import. Master data: SKU, SKU, barcode
- Production and import: full landed cost, duty, exchange rate and sewing price. Production and import
- Factory choice and quality: scorecard, offer comparison and the price of risk. Choosing a factory and quality
- Collection calendar and materials: critical path, fabric MOQ and material unification. Collection calendar and materials
- Customs and regulation: compliance costs, labeling and Russian and EAEU rules; check with a broker. Customs and regulation
What to understand
- Cost by specification
- Cost is built from materials with cutting waste, operations by minute, defects and overhead. Target cost works backwards from the shelf price.
- Factory quotes
- CMT, FOB and full-package quotes are compared on full cost. A cheap make price without fabric and logistics may be more expensive.
- Fabric and color MOQ
- The fabric minimum per color forces unified materials and postponed color choice. It affects money and time together.
- Calendar and critical path
- From sample approval to the shelf there is a chain where one delay shifts everything. Time slack belongs where risk is higher.
- Quality and inspection
- Sample inspection and the acceptable defect level define lot risk. Cost of quality includes prevention, control and losses.
- Import, customs and labeling
- Customs value, Incoterms, declaration and labeling are part of full cost. Requirements change, so check official sources and your broker.
- Far or near site
- Near production costs more per piece but is faster and more predictable. The break-even premium shows how much extra is justified. Air instead of sea is also a calculation.
- Supplier reliability
- A factory scorecard combines price, quality and timing. Dependence on one source is a risk to measure.
- Marking: the code chain
- The marking code runs from factory to till; waves by product group set deadlines. Check where in the chain a leftover without a code appears. Check deadlines with a lawyer.
- Payment, duty and import
- The full cost of an imported item includes payment, duty and import VAT. Import from the EAEU and from third countries is computed differently. Check with a broker.
- The factory contract
- What to fix: deadlines, quality, acceptance, penalties, intellectual property. Check with a lawyer.
- Defects and supplier return
- Defects by cause and supplier, reserve and return. It feeds the factory rating.
- OTIF and the lead time stack
- Lead time stacks from stages: material, cutting, sewing, inspection, delivery. Splitting by stage shows where days are lost, and supplier OTIF is measured on a pre-agreed window.
- Samples, tech pack and development cost
- Samples and the tech pack belong to the style cost; count them before ordering. Use the carbon estimate as a guide for material choice, not as a certified claim.
- Marking code chain and document exchange
- The marking code and delivery documents must be entered before shipment. Check deadlines and required fields with the operator and in the current text (checked 13.11.2026); confirm formalities with a lawyer.
Key measures
| Measure | Formula | How to read |
|---|---|---|
| Cost by specification | Materials with waste + operations + defects + overhead | Compare with target cost. |
| Full landed cost | Price + freight + duty + broker + other | It is the basis for comparing offers. |
| Marker efficiency | Pattern area ÷ marker area | Each percentage point costs money. |
| Factory OTIF | Factory orders delivered on time and in full ÷ all orders of the period | The same base as the KPI dictionary: orders. Include in the scorecard. |
| Defect cost | Defect share × unit cost + cost of rework | Compare with inspection costs. |
| Critical path slack | Time to sales start − length of the critical path | Below zero means a missed season. |
| Marking wave and leftover | Leftover without a code at the wave date | Decide: mark or sell off. |
| Full landed price | Price + duty + VAT + logistics | Compare offers by it. |
| Net defect loss | Defects − return − reserve | Compare by factory. |
| Supplier OTIF | Orders delivered on time and in full ÷ all orders of the period | Fix the window and quantity tolerance in the contract. |
| Lead time by stage | Sum of stage times from material order to receipt | Shows the stage with the largest risk buffer. |
| Sample cost | Sample, pattern and tech pack cost ÷ run | Compare styles by development cost per unit. |
Questions the role asks
- What does the item cost by spec and what price to set? Unit cost from the bill of materials, Cost and price: from fabric to the shelf
- Which factory quote is cheaper on full cost? Comparing quotes: CMT, FOB, full package
- What premium for a near site is justified? Far and near factory: break-even premium
- Will air freight instead of sea pay back? Air or sea: does speeding up pay
- How to inspect a lot by sample and what does a defect cost? Sampling inspection and cost of defects
- Do we have enough time before the sales start? Collection calendar: critical path and slack
- What documents and labeling are needed for import? Checklist of RF and EAEU rules for apparel, Customs value and Incoterms
- What does a micro-batch cost against a large one? Micro-batch versus large: fixed costs, experience curve, break point
- How does the rate affect payments to the factory by stage? Collection FX risk: cost in a foreign currency, payment horizon, hedge
- What about leftovers without a code and when is the next wave? Light-industry marking waves: dates and leftovers, Mark or sell off leftovers without a code
- What is the full landed price across offers? Landed cost of an imported item, Import from the EAEU or from a third country: duty, VAT and the full cost, Customs value and Incoterms
- What to fix in a factory contract? Brand contracts: what to put in writing
- What does lead time consist of and where are days lost? Supplier OTIF and the lead-time stack
- How much do material and sewing add to emissions? Carbon estimate per item: emissions by stage
Route through Lab
- Product and production
- Factory and supply
- Unit cost from the bill of materials
- Material use and cutting waste
- Cut-and-make price from factory minutes (CM)
- Allowable cost from the shelf price
- Comparing quotes: CMT, FOB, full package
- Factory scorecard
- Collection calendar: critical path and slack
- Sampling inspection and cost of defects
- Landed cost of an imported item
- Customs value and Incoterms
- Checklist of RF and EAEU rules for apparel
- Footwear returns: reasons, reverse logistics, the share back on sale and the loss
- Marking and trading leftovers
- The marking code chain: from factory to till
- Light-industry marking waves: dates and leftovers
- Mark or sell off leftovers without a code
- A payment abroad, import and export to the EAEU
- A payment to a foreign supplier: full cost, timing and exchange-rate risk
- Import from the EAEU or from a third country: duty, VAT and the full cost
- The legal minimum of a brand
- Brand contracts: what to put in writing
- Working with stock: transfers, top-up, defects, prices, order entry
- Defects: losses, supplier recovery and a reserve
- Import: payment, duty and VAT
- Collection lifecycle and the critical path
- Supplier OTIF and the lead-time stack
- Cost of a sample and tech pack: development cost of a style
- Carbon estimate per item: emissions by stage
- KPI dictionary and common definitions
- Production and import
- Choosing a factory and quality
- Collection calendar and materials
- Customs and regulation
- Should-cost vs the factory quote
- Combined duty rate and import VAT
- LCL vs full container: break-even volume
- Packing density: cartons, volumetric weight, container load
- Supplier concentration risk (HHI) and expected loss
- Cost of quality: prevention, appraisal, internal and external failure
- Work in progress and Little’s law
First 30 days
- Walk the marking chain. The marking code chain: from factory to till
- Check the marking wave for your groups. Light-industry marking waves: dates and leftovers
- Compute the full landed price. Landed cost of an imported item
- Compare EAEU and third-country import. Import from the EAEU or from a third country: duty, VAT and the full cost
- Walk the contracts checklist. Brand contracts: what to put in writing
- Compute the defect loss. Defects: losses, supplier recovery and a reserve
- Split lead time by stage. Supplier OTIF and the lead-time stack
- Open the lifecycle stages and assign owners for supply. Collection lifecycle and the critical path
- Calculate sample and tech pack cost. Cost of a sample and tech pack: development cost of a style
Common mistakes
- Comparing factories by make price without fabric and logistics.
- Not counting the cost of defects and accepting a lot with no sampling.
- Building a calendar with no slack on the critical path.
- Not checking import and labeling requirements for the current date.
- Buying a batch without checking that the marking code is set up before shipment.
- Comparing factories by item price without duty and VAT.
- Measuring OTIF without an agreed window and quantity tolerance.
- Not counting lead time by stage and seeing only the final date.
Reports to keep
- Supplier scorecard: Price, quality, timing, OTIF by factory.
- Cost sheet: Specification, materials, operations, full cost.
- Collection calendar: Critical path and slack by style.
- Quality and defects report: Inspection results, defects, causes, cost.
- Defect and return report: Defects by factory and cause, reserve, return.
- Supplier lead time and OTIF: Lead time by stage, OTIF by supplier and month.
Data to keep
- Supplier reference, lead times and terms. ERP and accounting system; Visitor counters
- Factory orders: dates, quantities, receipt facts. ERP and accounting system; PLM and production records
- Samples and tech pack in PLM. PLM and production records