The marking code chain: from factory to till
Shows the steps of a marking code for your role: what to do, what most often breaks and where costs build up. The steps follow the general code workflow; details for your group: check the rules of the marking system.
At a glance
- What question does it answer?
- Which steps a code passes and what most often breaks.
- What data is needed?
- Your role in the chain.
- How to read the result?
- For a manufacturer or importer 6 steps of 9, for a wholesaler 3, for a store 4, for a marketplace seller 4. Most common: a mismatch of codes between the UPD and the shelf and accepting goods without codes. Example on the default values: Steps for your role: 6; Steps in the whole chain: 9. The figures are illustrative: enter your own to see your result.
Why and how to reason
A marking code travels the whole path with the goods and a failure at any step stops the sale. So it is useful to know the chain in full though each participant has its own steps. The scheme has nine steps; six for a producer. Participant registration: electronic signature, a cabinet in the Chestny ZNAK system, opening a product group. Product description in the National Catalog: GTIN, customs code, size, color, composition. Ordering Data Matrix codes for each unit. Application to the item or label before putting into circulation. Putting into circulation. Shipment with codes in electronic document flow (UPD). Then withdrawal from circulation at the till on sale. What breaks most often: an error in the customs code gives an error in marking and in duty; poorly readable codes have to be re-marked; a mismatch of codes in the document and on the shelf leads to rejection at receipt. Costs accumulate in labels, labor and mistakes.
When to use it
Reach for it when launching marking, changing a supplier or factory and when analyzing errors. It suits a producer, importer, wholesaler and retailer: choose your role. It does not replace the system rules: steps follow a general scheme, check the details for your product group in the current rules (basis: Government decree No. 1956 and the decrees by wave). Reference as of 14.11.2026.
How to read the result
Mark the steps of your role and ask who is responsible for each and what happens if it is not done. Especially check steps that depend on others: does the supplier apply the code or you, who orders the codes, who describes the product in the catalog. If steps are missing add them to the contract. Use the “what breaks most often” column as an acceptance checklist. Then count costs in “Compliance and marking costs” and leftover deadlines in “Marking waves”. If you are new to marking, run the chain on one batch as a pilot and record at which step questions arose.
Common mistakes
Assuming marking concerns only the producer: retail is involved at the till. Accepting goods without checking codes in the document: responsibility also lies with the receiver. Not keeping records of codes separately from goods. Leaving errors in the catalog card: fixing them later is dearer. Another trap: expecting errors only from the factory when two thirds of problems come from the product card and the data in documents.
What data is needed?
- Your role in the chain.
Inputs
| Field | Unit | Value in the example | Meaning |
|---|---|---|---|
| Role in the chain | Manufacturer or importer | Only the steps that concern your role are shown. |
Worked numbers
Default values from the app; in the interactive version you enter your own.
- Steps for your role
- 6
- Steps in the whole chain
- 9
Chain steps
| Step | What happens | What most often breaks |
|---|---|---|
| Registering the participant | A qualified e-signature, an account in the Chestny Znak system (GIS MT), opening the product group. | Without a signature and an open group you cannot order codes or accept goods. |
| Describing the item | A card in the National Catalogue: GTIN, HS and OKPD 2 code, size, colour, composition. | A wrong HS code causes an error in marking and in duty. |
| Ordering codes | Data Matrix codes are ordered in the cabinet per unit; for leftovers the release method “Marking of leftovers” is chosen. | Take the code price and terms for leftovers from your operator contract. |
| Applying the code | The code goes on the item or label before entering circulation; a label printer and a scanner. | Poorly readable codes are re-marked: keep a stock of labels. |
| Entering into circulation | The data is submitted to the system; after that the goods may be shipped and sold. | For leftovers the entry deadline is separate (see “Marking waves”). |
| Shipping with codes | A UPD in electronic document flow with the codes of every unit (item-level accounting). | A mismatch between the codes in the document and on the shelf leads to rejection on acceptance. |
Basis: Government Decree of 31.12.2019 No. 1956 and the decrees for each wave; check dates and documents against the acts in force. A reference as of 13.11.2026; check with a lawyer.
Norms (a guide as of 13.11.2026, check against the act text): Government Decree of 31.12.2019 No. 1956 (light-industry marking rules); Chestny Znak (marking system operator). Check with a lawyer.
Nuances and limits
- The document format depends on the group and the operator’s rule version.