From factory capacity and costs to the cost of a minute, the cut-and-make price of an item, capacity in units and the lead time of an order. Method: cost per minute × standard time of the item.

Production and import For whom: Owners and managers of sewing factories and brands ordering sewing.

Calculate on your data →

At a glance

What question does it answer?
What a factory minute costs, the cut-and-make price, capacity and order lead time.
What data is needed?
Number of workers, working days, hours, lost time and line efficiency.
How to read the result?
Cost per minute times the item’s minutes adjusted for efficiency gives the cut-and-make cost, to which factory profit is added. “Order lead time” shows working days at the chosen capacity. Example on the default values: 40 workers, 250 days, 8 hours, 25% lost time and 80% efficiency: a workshop minute costs RUB 11.94. A 25-minute item costs RUB 373.26, the sewing price (CM) with a 20% profit is RUB 447.92 and the full factory price (FOB) is RUB 1,372.92. Capacity is 115,200 units a year and an order of 5,000 units takes about 11 working days. If a contractor’s sewing price is well above your workshop minute, ask for the composition of overheads and SAM. Next: “Production load plan” and “Comparing quotes: CMT, FOB, full package”.

Why and how to reason

A workshop sells minutes of work, so the sewing price is computed from the cost of a minute. First we compute available minutes: workers x days x hours x 60 x (1 - loss). Time losses are downtime, changeovers, leave. Then all workshop costs (direct and indirect labor, overheads) are divided by available minutes: that gives the cost of a minute.

Next the item. SAM is the standard time per item in ideal conditions. A real line needs more time, so SAM / efficiency. Item cost = SAM / efficiency x cost of a minute. Sewing price (CM) = cost x (1 + profit).

Example. Minutes 40 x 250 x 8 x 60 x 0.75 = 3.6 m a year. Cost of a minute RUB 11.94. SAM 25 min at 80% efficiency: 31.25 min x 11.94 = RUB 373. With a 20% profit the sewing price is RUB 448. With materials (RUB 925) FOB is RUB 1,373. Capacity 3.6 m x 0.8 / 25 = 115,200 items a year.

When to use it

It comes in handy to compute the sewing price at your own workshop or to check a contractor’s price. It helps understand where the factory has room in its price and where it does not. Assumption: workshop load is constant and costs are spread evenly across minutes. With partial utilization the cost of a minute grows, because overheads are divided over fewer minutes. Update norms after time studies.

How to read the result

Compare the cost of a minute and the sewing price with factory quotes. If a factory asks noticeably less, check which costs it does not include (rent, losses). The order time (10.9 days) helps plan launch. Capacity in pieces shows whether the order fits in the workshop. Decision: accept an order at a price not below cost, and when underloaded consider that overheads are covered by another order. Then update SAM from timing studies. Also check that the sewing price covers idle minutes: if the workshop is 60% loaded but the calculation assumes 100%, the price will be understated.

Common mistakes

The usual mistakes: using SAM without efficiency; taking working hours without losses; leaving out overheads; applying one item’s norm to another. Also: assuming 100% efficiency. Also: assuming that higher load does not change the cost of a minute, although overheads are split over more minutes.

What data is needed?

  • Number of workers, working days, hours, lost time and line efficiency.
  • Annual factory costs: direct and indirect labor, overheads.
  • The item’s standard time (SAM) and the order size.
  • Where to take it: workers, days, hours and lost time from the timesheet and the workshop calendar; line efficiency from output records; annual direct and indirect labor and overheads from the workshop’s accounts; item labor content (SAM) from time study or the technologist’s norms; materials from the specification. Capacity first, then costs, then the item.

Inputs

FieldUnitValue in the exampleMeaning
Workers on the linepeople40How many people work on the line; available minutes depend on them.
Working days a yeardays250How many working days per year the factory has, excluding days off and downtime.
Productive hours a dayhours8Productive hours per day per person excluding breaks; do not count lost time twice.
Lost time%25Downtime, changeovers, waiting for material, training. The value in the example is illustrative, replace it with your own. The three reducing parameters (hours, lost time, efficiency) must not count the same thing twice: if the hours already exclude downtime, lower the lost time.
Line efficiency%80The share of standard time actually achieved. The lower it is, the more minutes per item.
Direct labor (cutting, sewing, QC, packing)₽27,000,000Annual direct labor cost: cutting, sewing, inspection, packing.
Indirect labor (management, admin)₽6,500,000Annual cost of factory management and administration.
Overheads (rent, energy, equipment, transport)₽9,500,000Annual overheads: rent, energy, equipment, transport.
Standard time of the item (SAM)min25The sum of standard minutes of all operations: from time study or standards. Without it the result is imprecise.
Factory profit% of cost20The profit the factory adds on top of cost, as a percentage of cost.
Order sizeunits5,000How many items are in the order; it sets how much factory time it takes.

How it is calculated

StepFormula
Available minutesWorkers × days × hours × 60 × (1 − losses)
Cost per minute(Direct + indirect labour + overheads) ÷ available minutes
Cost per itemSAM ÷ efficiency × cost per minute
CM priceCost per item × (1 + profit)

Worked numbers

Default values from the app; in the interactive version you enter your own.

Cost per factory minute
11.94 ₽Annual cost ÷ available minutes.
Cost per item
373.26 ₽Item minutes adjusted for efficiency × cost per minute.
Cut-and-make price incl. profit
447.92 ₽
Full factory price (FOB)
1,372.92 ₽Cut-and-make price + materials and packing from the table.
Capacity per year
115,200 units
Order lead time
10.9 working daysOrder size ÷ daily output, without downtime beyond the losses counted.

A factory minute costs 11.94 ₽; an item of 25 min costs 373.26 ₽ before profit. An order of 5,000 units takes about 11 working days at current capacity. Five points more efficiency lowers the cost per item by about 6 %.

Nuances and limits

  • Accuracy depends on SAM: without a time study the result is approximate.
  • Lost time of 25% and efficiency of 80% in the example are method references, replace them with your own.
  • Lost time of 25% and efficiency of 80% in the example illustrate the method: enter your own from actual records.

Terms used