From a list of operations (operative time, repeats, grade) calculates the standard minutes per garment with allowances, the labor cost at the given hourly cost and norm attainment, the factory overhead and profit, the calculated sewing price and the cost of a standard minute, garments per worker per shift and the share of the longest operations; checks the calculated price against the factory quote and shows how many minutes are built into it.
At a glance
- What question does it answer?
- How many standard minutes a garment takes and what sewing should cost at your rate and norm attainment, and how many minutes are built into the factory quote.
- What data is needed?
- The list of the garment’s operations with the time of one execution and the repeats.
- How to read the result?
- Example on the default values (a women’s shirt, 12 operations): operative time 17.1 min, SAM 19.1 min; labor RUB 167.79, sewing price RUB 319.47, a standard minute RUB 16.73. The factory quote is 13% above the calculation, it holds 21.5 min. Example on the default values: Operative time per garment: 17.05 min; Standard time SAM: 19.1 min; Labor cost per garment: RUB 167.79; Workshop overhead per garment: RUB 117.45. The figures are illustrative: enter your own to see your result.
Why and how to reason
The factory names a price per garment but counts minutes: how many minutes a sewer works on the garment and what a workshop minute costs. So the price can be checked fairly only by splitting the garment into operations. The operation time is taken as normal for a trained sewer, multiplied by the repeats (two sleeves, two cuffs) and allowances for workplace upkeep, rest and personal needs are added: that gives the standard SAM. Then minutes turn into money: the hourly rate is divided by 60, divided by norm attainment (a sewer does not always deliver 100% of the standard) and multiplied by the grade factor of a complex operation. Overhead and profit are added to labor. Example: 12 operations give 17.05 minutes of operative time and 19.10 minutes of SAM, labor of RUB 167.79, a sewing price of RUB 319.47 or RUB 16.73 per standard minute.
When to use it
Reach for it when you compare factory quotes for one style, assess what a complication (pockets, trim) will cost, prepare a price negotiation or check whether extra minutes are built in. It does not fit when you have no operation times: then a timing study on the sample is needed first. It does not replace the factory’s piece rate and does not know its stoppages and changeovers. For footwear and accessories the list of operations and the grades are their own; take the values of allowances, overhead and profit from your factory or your own accounts.
How to read the result
Look at three numbers. First: the sewing price and the price of a standard minute, convenient for comparing different styles and factories. Second: the difference with the factory quote. A plus of 12.7% in the example means the factory builds in about 21.5 minutes instead of 19.1: either more operations, or higher allowances, or higher overhead. It is a reason to ask, not proof of overstating. Third: the share of the three longest operations (about 39%): simplifying exactly these units gives the most. If the quote is below the calculation by a fifth or more, check that pressing, inspection and packing are not missed and the difference will not go into defects.
Common mistakes
The first error: taking operation times from a foreign table for another fabric and equipment. The second: forgetting repeats (sleeves, cuffs) or the last operations: pressing, inspection, packing. The third: not counting norm attainment and getting a minute pay below the real one. The fourth: taking the calculation for a piece rate and bargaining “by the calculation” while ignoring the factory’s stoppages.
What data is needed?
- The list of the garment’s operations with the time of one execution and the repeats.
- The sewer’s rate with contributions, allowances, norm attainment, overhead and profit.
- The factory quote per garment for the check.
Inputs
| Field | Unit | Value in the example | Meaning |
|---|---|---|---|
| Allowances on operative time | % | 12 | The share of time for workplace upkeep, rest and personal needs on top of the operative time. Taken from your factory’s norms, not from other industry tables. The example value is illustrative. |
| Norm attainment | % | 85 | The share of standard minutes a sewer really delivers per paid time. Below 100% the paid time costs more than the standard. The example value is illustrative. |
| Cost of a sewer’s hour with contributions | RUB/h | 420 | The base-grade pay per hour together with insurance contributions. Workshop data; regional rates differ a lot. The example value is illustrative. |
| Net sewer minutes per shift | min | 450 | The shift length net of breaks and stoppages. Needed for garments per sewer per shift. The example value is illustrative. |
| Workshop overhead on labor | % | 70 | Rent, energy, equipment, foremen, QC, administration: in percent of the sewers’ labor. Taken from the workshop’s accounts. The example value is illustrative. |
| Factory profit on cost | % | 12 | The factory’s markup on labor plus overhead. The example value is illustrative. |
| Lot size | units | 1,000 | How many garments in the order: for the lot cost. The example value is illustrative. |
| Sewing price from the factory quote | per garment | 360 | The sewing price without materials per garment: to check against the calculated one. Empty: no check. The example value is illustrative. |
How it is calculated
| Step | Formula |
|---|---|
| Operation time | Operation SAM = seconds × repeats ÷ 60 × (1 + allowances) |
| Operation pay | Operation SAM × grade factor × (hourly rate ÷ 60) ÷ norm attainment |
| Sewing price | (labour + overhead) × (1 + profit) |
| Check | Minutes in the quote = factory price ÷ (calculated price ÷ SAM); 12 operations, 17.05 operative minutes |
| The simple rule | Operations giving 80% of the time: 8; these are simplified first |
Worked numbers
Default values from the app; in the interactive version you enter your own.
- Operative time per garment
- 17.05 minThe sum of operation times without allowances.
- Standard time SAM
- 19.1 minOperative time with allowances: the basis for price and capacity.
- Labour cost per garment
- 167.79 ₽
- Workshop overhead per garment
- 117.45 ₽
- Factory profit per garment
- 34.23 ₽
- Calculated sewing price
- 319.47 ₽Labour plus overhead plus profit, without materials and VAT.
- Price of a standard minute
- 16.73 ₽Calculated price ÷ SAM: convenient for comparing factories and styles.
- Garments per sewer per shift
- 20
- Sewing cost of the lot
- 319,475 ₽
- Share of the three longest operations
- 39.1 %The higher it is, the more effective it is to simplify exactly these.
- Factory quote against the calculation
- +12.7 %Plus: the factory asks more than the calculation; a reason to find out which minutes and allowances it builds in.
- Minutes in the factory quote
- 21.52 minThe factory price ÷ the calculated price of a standard minute: how many standard minutes it builds in on average.
Data as a table
| Measure | Standard time |
|---|---|
| Preparing pieces and fusing the collar | 1.31 |
| Joining the shoulder seams | 0.52 |
| Setting in the sleeves | 2.05 |
| Joining the side and sleeve seams | 1.77 |
| Making the collar and the stand | 2.61 |
| Attaching the collar | 1.68 |
| Making and attaching the cuffs | 2.8 |
| Making the placket and buttonholes | 2.05 |
| Hemming the bottom | 0.84 |
| Sewing on buttons by machine | 0.75 |
| Pressing | 1.59 |
| Inspection and packing | 1.12 |
Data as a table
| Measure | Per garment |
|---|---|
| Labour | 168 |
| Overhead | 117 |
| Profit | 34.2 |
Operations and their weight
| Operation | Operative, sec | Repeats | SAM, min | Pay | Share, % |
|---|---|---|---|---|---|
| Preparing pieces and fusing the collar | 70 | 1 | 1.31 | 10.76 ₽ | 6.8 |
| Joining the shoulder seams | 28 | 1 | 0.52 | 4.3 ₽ | 2.7 |
| Setting in the sleeves | 55 | 2 | 2.05 | 18.6 ₽ | 10.8 |
| Joining the side and sleeve seams | 95 | 1 | 1.77 | 14.6 ₽ | 9.3 |
| Making the collar and the stand | 140 | 1 | 2.61 | 25.83 ₽ | 13.7 |
| Attaching the collar | 90 | 1 | 1.68 | 16.6 ₽ | 8.8 |
| Making and attaching the cuffs | 75 | 2 | 2.8 | 25.36 ₽ | 14.7 |
| Making the placket and buttonholes | 110 | 1 | 2.05 | 18.6 ₽ | 10.8 |
| Hemming the bottom | 45 | 1 | 0.84 | 6.92 ₽ | 4.4 |
| Sewing on buttons by machine | 40 | 1 | 0.75 | 6.15 ₽ | 3.9 |
| Pressing | 85 | 1 | 1.59 | 11.76 ₽ | 8.3 |
| Inspection and packing | 60 | 1 | 1.12 | 8.3 ₽ | 5.9 |
The calculation gives a basis for a talk with the factory, not its true price: the factory sees its own stoppages, changeovers and load. Time is taken from a timing study on your style; foreign standards with other equipment and fabric give a foreign number. For footwear time is counted by lasting and sole operations, for accessories by assembly and trims, for children’s by fewer operations but more often small lots.
Nuances and limits
- Taking foreign minutes for another fabric and equipment: the result is foreign.
- Forgetting pressing, inspection and packing: the price is understated.
- Taking the calculation for a piece rate: the factory sees stoppages and changeovers that are not in the model.