Customer-supplied materials (tolling)
A scheme in which the customer hands its fabric and trims to the factory and the factory sews and receives only a fee for the work; consumption and loss norms are fixed in the contract.
Formula
Customer cost = materials + sewing price + logistics
How to read
The risk of fabric overuse lies with the customer until the contract introduces a penalty for exceeding the norm.
Where it is discussed
Topics
Calculations
- Time standard of a garment by operation: labor cost, sewing price and a check against the factory
- Customer-supplied material vs factory-bought
Documents
- The production base map: countries and specializations, idea-to-shelf time, the 2+1 scheme and exchange rate sensitivity
- The customer-supplied materials scheme: the contract, accounting, tax, customs, rights to the fabric, responsibility for losses and a calculation against FOB
- Cutting and fabric consumption: the marker, material utilization, losses and a check of the factory norm
- The factory under a magnifier: price by article, single-supplier risk, cost of quality, yield and money in the workshop