Customer-supplied material vs factory-bought
Compares two ways to supply fabric for a piece: the factory buys it itself and charges a markup, or you hand the fabric to the factory (a customer-supplied scheme) and bear logistics, the cost of paying early, insurance and possible losses above the norm. Shows the saving per piece and the break-even factory markup.
At a glance
- What question does it answer?
- What is cheaper: giving fabric to the factory or leaving the buying to it.
- What data is needed?
- Fabric price and consumption.
- How to read the result?
- The saving per piece and the break-even factory markup. Example on the default values: Through the factory: RUB 680.96; Customer-supplied material: RUB 639.59; Saving per piece: +RUB 41.37; Saving to the factory scheme: +6.1%. The figures are illustrative: enter your own to see your result.
Why and how to reason
A customer-supplied scheme pays off when logistics and the cost of early payment are below the factory markup. In the example through the factory it is RUB 681.0 per piece, customer-supplied RUB 639.6, saving RUB 41.4 (6.1%); the break-even markup 5.2%.
When to use it
Apply when choosing how to supply fabric to a new factory. Check accounting and taxes on the handover of material with a specialist.
How to read the result
Look at the saving and the break-even markup: if the factory asks for less, leave the buying to it.
Common mistakes
They do not fix loss norms, do not insure the material and ignore payment terms.
What data is needed?
- Fabric price and consumption.
- Factory markup.
- Logistics, days of early payment, loss norms.
Inputs
| Field | Unit | Value in the example | Meaning |
|---|---|---|---|
| Fabric price | RUB/m | 380 | The purchase price of a meter excl. VAT delivered to your warehouse. The example value is illustrative. |
| Consumption per piece with the waste norm | m | 1.6 | The waste norm is already inside the consumption. The example value is illustrative. |
| Factory markup on material | % | 12 | The percent the factory adds to the fabric price when it buys itself. The example value is illustrative. |
| Fabric logistics to the factory | RUB/m | 6 | Delivery of a meter from your warehouse to the workshop. The example value is illustrative. |
| Days of early payment | days | 60 | By how many days earlier you pay for the fabric than the factory would pay the supplier with its own money. The example value is illustrative. |
| Cost of money | % per year | 22 | Your loan rate or required return. The example value is illustrative. |
| Material insurance | % | 0 | Optional: percent of the fabric cost. The example value is illustrative. |
| Waste norm in the contract | % | 5 | Already in the consumption: only the excess is counted. A guide, not a norm: check it against the act in force at the calculation date (checked 2026-11-17). The example value is illustrative. |
| Actual waste | % | 5 | From the factory’s previous orders. A guide, not a norm: check it against the act in force at the calculation date (checked 2026-11-17). The example value is illustrative. |
| The share of the excess the factory compensates | % | 100 | By contract: at 100% the excess does not affect you. A guide, not a norm: check it against the act in force at the calculation date (checked 2026-11-17). The example value is illustrative. |
How it is calculated
| Step | Formula |
|---|---|
| Through the factory | price × (1 + markup) × consumption |
| Customer-supplied | price × consumption + logistics × consumption + price × consumption × rate × days ÷ 365 + insurance + excess |
| Break-even markup | (logistics + cost of money + insurance + excess) ÷ (price × consumption) |
Worked numbers
Default values from the app; in the interactive version you enter your own.
- Through the factory
- 680.96 ₽Price × (1 + markup) × consumption.
- Customer-supplied material
- 639.59 ₽Price × consumption + logistics + cost of money + insurance + losses.
- Saving per piece
- +41.37 ₽
- Saving to the factory scheme
- +6.1 %
- Break-even factory markup
- 5.2 %At this markup the schemes are equal.
- Logistics
- 9.6 ₽
- Cost of early payment
- 21.99 ₽
- Losses above the norm
- 0 ₽
- Fabric
- Logistics, money, losses
Data as a table
| Measure | Fabric | Logistics, money, losses |
|---|---|---|
| Through the factory | 681 | 0 |
| Customer-supplied | 608 | 31.6 |
Comparison of schemes
| Item | Through the factory | Customer-supplied |
|---|---|---|
| Fabric | 608 ₽ | 608 ₽ |
| Factory markup | 72.96 ₽ | — |
| Logistics | — | 9.6 ₽ |
| Cost of early payment | — | 21.99 ₽ |
| Insurance | — | 0 ₽ |
| Losses above the norm | — | 0 ₽ |
| Total | 680.96 ₽ | 639.59 ₽ |
A specialist check is needed. Rates, thresholds, terms and tariffs here are entered as guides as of 2026-11-17: check each value against the act in force at the calculation date. The calculation is arithmetic and draws no legal conclusions.
What to do with the result: if the saving is small and the material is expensive, leave the buying to the factory and haggle over the markup; the customer-supplied scheme wins when you have a better fabric price and cheap money. Check the handover order, accounting, taxes and liability with an accounting and tax specialist. A typical mistake: not fixing the loss norms, not insuring the material, ignoring the payment terms.
Nuances and limits
- Not fixing loss norms.
- Not insuring the material.
- Ignoring payment terms.