Cutting waste
The share of material above the use norm lost to offcuts and defects.
Formula
Material cost = price × use × (1 + waste)
How to read
Cutting waste on the main fabric gives the most noticeable saving per order.
Where it is discussed
Topics
- Cost and price
- Production and import
- Order size and break-even
- Choosing a factory and quality
- Collection calendar and materials
Calculations
- Unit cost from the bill of materials
- Material use and cutting waste
- Marker: efficiency and the price of a percentage point
- Fabric use by marker: material utilization, losses and their price in roubles
- Yield cascade across stages
- Should-cost vs the factory quote
- Customer-supplied material vs factory-bought
Documents
- Tech pack (product technical dossier)
- Color and materials: lab dips, metamerism, hand feel, lab tests, acceptance
- The customer-supplied materials scheme: the contract, accounting, tax, customs, rights to the fabric, responsibility for losses and a calculation against FOB
- Cutting and fabric consumption: the marker, material utilization, losses and a check of the factory norm
- Footwear and leather goods production: the last, technology, tooling, yield per hide and defects