SAM (standard time) and cost per minute
SAM is the standard minutes per item; cost per minute is factory cost per available minute.
Formula
Cost per minute = annual factory cost ÷ available minutes; cost per item = SAM ÷ efficiency × cost per minute
How to read
Accuracy depends on SAM: take it from a time study or standards.
Where it is discussed
Topics
- Cost and price
- Production and import
- Choosing a factory and quality
- Collection calendar and materials
- Marketing budget and testing impact
Calculations
- Unit cost from the bill of materials
- Cut-and-make price from factory minutes (CM)
- Marker: efficiency and the price of a percentage point
- Production load plan
- Time standard of a garment by operation: labor cost, sewing price and a check against the factory
- Line balance: takt, sewers per operation, bottleneck and shift output
- Should-cost vs the factory quote
- Segment size: TAM, SAM and SOM in two ways (top-down by shares and bottom-up from the budget)
Documents
- Tech pack (product technical dossier)
- Fashion tech: digital product passport, RFID, AR try-on, 3D design
- The customer-supplied materials scheme: the contract, accounting, tax, customs, rights to the fabric, responsibility for losses and a calculation against FOB
- Sewing technology and work standards: operations, time standard, cost per minute, line balance and line load
- The factory under a magnifier: price by article, single-supplier risk, cost of quality, yield and money in the workshop