The factory under a magnifier: price by article, single-supplier risk, cost of quality, yield and money in the workshop

The document gathers six checks a brand makes before an order and after the first batch: a justified sewing price from its own norms, supplier concentration, the cost of quality, yield by stage, money in work in progress and the choice between a customer-supplied scheme and the factory buying the material. The decision it supports: at what price, launch volume and supply scheme to agree with a factory.

Production, logistics, channels Brand and retail Verified: 2026-11-17

Open interactively →

Why this document

A factory knows its costs better than the brand, and haggling over the total is lost by the one without its own breakdown. If the price is split into materials, labor, overheads and profit, it is visible in which article the quote diverges from the norms, and the argument is about the time study, not about mood. The same principles work for quality and launch: the cost of defects and the yield by stage turn the words “all is fine with us” into roubles. The document is read by the buyer, the production manager, the technologist and the finance director.

At a glance

What is this document and why is it needed?
The document gathers six checks a brand makes before an order and after the first batch: a justified sewing price from its own norms, supplier concentration, the cost of quality, yield by stage, money in work in progress and the choice between a customer-supplied scheme and the factory buying the material. The decision it supports: at what price, launch volume and supply scheme to agree with a factory.
Who owns the document and how often is it rebuilt?
Brand: the production manager collects the norms and the time study, the buyer negotiates, the finance director approves the assumptions; recalculate before each order and after each batch.
What mistakes are the most common?
Taking SAM from the factory’s word → the should-cost repeats its norms → measure with a time study. Comparing a quote with logistics against one without → the gap is distorted → bring them to the same terms. Counting supplier risk only by share → the replacement time is ignored → enter the weeks without supply.

For whom

Brand
A brand on contract compares factory quotes, counts the launch for an order and the defect reserve and decides whether to supply fabric itself. The consumption norms and the time study belong to the brand, not to the factory.
Retail
A retailer with a private label does the same on a smaller scale: the should-cost helps check an agent’s quote, and the cost of quality shows what returns of the private label cost.

What it consists of

The should-cost of a piece

  • Materials = fabric consumption × price × (1 + waste) + trims + packing. Labor = SAM in minutes × the factory rate per minute. Overheads = a percent of labor. Factory profit = a percent of the subtotal.
  • If the factory disclosed the price breakdown, the gap is split into materials, labor with overheads and profit; the largest positive gap is the article to negotiate. If it did not, the calculation shows the profit the quote builds in at your norms.
  • The price is compared on the same terms: with fabric or without, with logistics or without. Otherwise the gap measures the difference of terms, not the factory’s greed.

Supplier concentration and a second source

  • HHI is the sum of squared supplier shares; the inverse shows the effective number of equal suppliers. The expected loss equals the probability of failure times the share of the largest, the margin and the share of the season without supply.
  • A second source pays off when the loss it removes is above the price surcharge on the moved volume. The switching time enters the calculation as a separate number: there is no instant replacement.

The cost of quality and the yield

  • The cost of quality is prevention, appraisal, internal and external failure. External failure includes customers’ returns, exchanges and claims; if it is zero, it was most likely not counted.
  • The yield multiplies by stage: cutting, sewing, QC, packing. For the required good pieces the launch equals the target divided by the rolled yield; the losses of each stage are counted at the accumulated cost.
  • Reworking part of the QC rejects raises the QC yield but costs money: the net effect equals the saved losses minus the cost of rework.

Money in the workshop and the customer-supplied scheme

  • By Little’s law there are as many pieces in progress as the daily output times the cycle time. Money in them is counted by the degree of completion, not by the full cost.
  • The customer-supplied scheme wins if logistics, the cost of early payment, insurance and losses above the norm are less than the factory’s markup on material. Accounting, taxes and liability for handing over the material are defined by the contract and a specialist.

What to do with the result

  • Show the factory the should-cost by article and ask it to disclose the article with the largest gap; check SAM with your own time study.
  • Put the launch, not the number of good pieces, into the order and write the defect allowance into the contract; revise the norms after each batch.
  • If one supplier holds most of the buy, qualify a second one on a small volume in advance: it is cheaper than looking for a replacement at the moment of failure.

Where the data comes from

Data sourceFields
Specification and time studyfabric consumption, waste, trims, packing, SAM, factory rate
Purchases and deliveriessupplier shares, margin, replacement terms, factory quotes
Quality and productiondefects by stage, returns, daily output, cycle time, accumulated cost

How to build it step by step

  1. Step 1: Collect the norms from the specification and measure SAM with a time study.
  2. Step 2: Count the should-cost by article and compare it with the quote on the same terms.
  3. Step 3: Ask the factory for the price breakdown and find the article with the largest gap.
  4. Step 4: Count the supplier shares, HHI and the expected loss of a failure of the largest.
  5. Step 5: Compare the loss with the cost of a second source and decide whether to qualify it.
  6. Step 6: Collect the four categories of the cost of quality, including returns, and find the failure share.
  7. Step 7: Count the launch from the stage yields and the losses in money at the accumulated cost.
  8. Step 8: Estimate the money in the workshop and compare the customer-supplied scheme with buying by the factory.

Formulas

MeasureFormulasNote
Should-cost(materials + labor + overheads) × (1 + profit); gap = quote − should-costPrices excl. VAT, on the same delivery terms.
Launchrequired good pieces ÷ (cutting yield × sewing yield × QC yield × packing yield)Round up.
Money in the workshopdaily output × cycle time × cost × degree of completionFor a steady flow.

Worked example

An illustrative example: a quote of RUB 1,720 against the should-cost and the launch for 5,000 good pieces

MetricValue
Materials, RUB806.0
Labor, RUB437.0
Should-cost, RUB1,480.2
Gap, RUB239.8
Rolled yield, %88.0
Launch, pcs5,683

HHI of suppliers is 300.0 thousandths, the cost of quality RUB 7.8 million, money in the workshop RUB 6.0 million, saving under the customer-supplied scheme RUB 41.4 per piece. All numbers are illustrative.

Figures

From norms to the factory price
Waterfall: Materials +806, Labor +437, Overheads +79, Profit +159, Gap +240, Quote 1,72005001,0001,5002,000MaterialsMaterialsMaterials: +806+806LaborLaborLabor: +437+437OverheadsOverheadsOverheads: +79+79ProfitProfitProfit: +159+159GapGapGap: +240+240QuoteQuoteQuote: 1,7201,720RUB
  • positive
  • negative
  • total
Data as a table
StepChangeLevel
Materials+806806
Labor+4371,243
Overheads+791,322
Profit+1591,481
Gap+2401,721
Quote—1,720

From norms to the factory price. The gap between the should-cost and the quote is a separate step.

Cost of quality by category
Bar chart: Prevention 0.8, Appraisal 1.5, Internal failure 2.4, External failure 3.101234PreventionPreventionCosts: 0.80.8AppraisalAppraisalCosts: 1.51.5Internal failureInternal failureCosts: 2.42.4External failureExternal failureCosts: 3.13.1m RUB
Data as a table
MeasureCosts
Prevention0.8
Appraisal1.5
Internal failure2.4
External failure3.1

Cost of quality by category. Failures are more than twice as heavy as prevention and appraisal together.

Specifics by category

Apparel
Apparel: SAM and waste depend on the fabric pattern and the number of sizes in the marker.
Footwear
Footwear: defects and yield by stage are counted separately by last and upper material.
Accessories
Accessories: trims and packing give a noticeable share of the price, count them line by line.
Kids
Kids: higher inspection requirements and external failure by claims, set aside more for appraisal.
Men
Men: long runs, stable yield, a time study pays off faster.
Women
Women: more styles and short runs, a longer cycle, work in progress costs more.

Common mistakes

  • Taking SAM from the factory’s word → the should-cost repeats its norms → measure with a time study.
  • Comparing a quote with logistics against one without → the gap is distorted → bring them to the same terms.
  • Counting supplier risk only by share → the replacement time is ignored → enter the weeks without supply.
  • Counting only workshop defects → customer returns are not counted → include external failure.
  • Taking an average yield instead of the yield by stage → the launch is understated → count each stage.
  • Counting work in progress at the full cost → money in the workshop is overstated → take the degree of completion.
  • Giving material without loss norms and insurance → losses fall on the brand → fix norms in the contract.

Russian specifics

  • The method is managerial and not regulated; accounting and taxes on handing material over to a factory (the customer-supplied scheme) are defined by the contract and the accountant. The defect allowance is written into the contract through AQL.

Open interactively →