Syntha Lab RU

Should-cost

The price of a piece built from your norms: materials with waste, labor by time per workshop minute, overheads and the factory profit. The basis for negotiation, not the final price.

Production and import

Open interactively →

Formula

Should-cost = (materials + labor + overheads) × (1 + profit)

How to read

Compare on the same delivery terms.

Where it is discussed

Topics

Calculations

Documents

Other terms in the group

Open interactively →