Should-cost
The price of a piece built from your norms: materials with waste, labor by time per workshop minute, overheads and the factory profit. The basis for negotiation, not the final price.
Formula
Should-cost = (materials + labor + overheads) × (1 + profit)
How to read
Compare on the same delivery terms.