Material use and cutting waste
Calculates material cost per unit and per order including cutting waste and defects, how many meters to buy and how much money goes to waste.
At a glance
- What question does it answer?
- What materials cost per item and per order including waste and how many meters to buy.
- What data is needed?
- The number of items in the order.
- How to read the result?
- Look at the waste share and the most expensive line: that gives the main saving. The “Buy” column shows the quantity including waste. Example on the default values: A run of 2,000 units with 5 materials: materials per unit RUB 1,220.91, per run RUB 2,441,820. Waste costs RUB 111.91 per unit (9.2% of materials) and the costliest line is the main fabric at RUB 806.40; cutting its waste by 1 pp saves about RUB 14,400 per run. If the waste share on the costliest fabric is higher than on similar models, revisit the marker or the fabric width. Next: “Marker: efficiency and the price of a percentage point” and “Unit cost from the bill of materials”.
Why and how to reason
An item uses more fabric than the pattern shows: cutting leaves scraps and part of the material is rejected. So material cost = price x pattern usage x (1 + waste). Waste is a share on top of the norm, not part of the usage.
Cutting loss differs by line. The main fabric loses a noticeable share; hardware has little waste (a defective zip). So we calculate each material separately, and obtain the overall waste share as the money that went into waste / material cost.
Example. Main fabric: RUB 450 x 1.6 m x 1.12 = RUB 806.4 per item. Lining 180 x 1.4 x 1.08 = 272.2. The sum over all five materials is RUB 1,220.91. Waste RUB 111.91 per item, 9.2% of materials. For a run of 2,000 items materials are bought for RUB 2.44 m, of which about RUB 224 k goes into waste.
When to use it
It fits when preparing a fabric order and when assessing a new pattern: how many meters to buy and what waste will cost. It does not replace a marker layout: the real waste percentage comes from laying patterns on the fabric. Assumption: the price per meter is the same for the whole run. If fabric is bought in price tiers, calculate separately. Recalculate when changing the fabric supplier.
How to read the result
Look at the waste share and the most expensive line. In the example the fabric gives RUB 806 of 1,221, or 66% of materials; cutting its waste by 2 percentage points saves a noticeable amount on the run. Check for lines where waste is generously padded “just in case”. Decision: work with the marker to cut waste where the weight is biggest, and negotiate the price of the main fabric. Compare usage with actual after the first run and fix the real waste percentage in the norm. If the difference exceeds two points, look for the cause in the marker or fabric quality.
Common mistakes
Computing waste on total usage rather than per line; entering usage already including waste (so it is counted twice); forgetting that patterns for different sizes give different usage. Also: not allowing for shrinkage and fabric defects. Also: relying on the best marker.
What data is needed?
- The number of items in the order.
- For each material: price, use per item, waste percentage.
- Where to take it: material prices from supplier invoices and price lists; usage per item from the marker for the specific fabric width (CAD or the technologist); waste from the actual cutting of past runs (cutting records, warehouse). Units from the production plan.
Inputs
| Field | Unit | Value in the example | Meaning |
|---|---|---|---|
| Items in the order | units | 2,000 | How many items are in the run; material use is multiplied by it. |
How it is calculated
| Step | Formula |
|---|---|
| Material cost | Price × use × (1 + waste) |
| Purchase | Use × (1 + waste) × items |
Worked numbers
Default values from the app; in the interactive version you enter your own.
- Materials per item
- 1,220.91 ₽
- Materials for the order
- 2.44 m ₽
- Waste per item
- 111.91 ₽Money lost to offcuts and defects.
- Waste share
- 9.2 %
- Biggest item
- 806.4 ₽ · Main fabric
How much to buy
| Material | Per item | Incl. waste | Buy, units |
|---|---|---|---|
| Main fabric | 806.4 ₽ | 86.4 ₽ | 3,584 |
| Lining | 272.16 ₽ | 20.16 ₽ | 3,024 |
| Zip | 46.35 ₽ | 1.35 ₽ | 2,060 |
| Buttons and trims | 75.6 ₽ | 3.6 ₽ | 12,600 |
| Thread and labels | 20.4 ₽ | 0.4 ₽ | 2,040 |
Waste costs 111.91 ₽ per item (9 % of materials) and 223,820 ₽ per order. Cutting waste on the biggest item (“Main fabric”) by one point saves about 14,400 ₽ per order.
Nuances and limits
- Check actual use on the pattern layout for the specific fabric width.
- Shrinkage and cutting allowances are not waste: put them in usage, otherwise the waste rate mixes different causes.
- The price per meter must include delivery to the workshop and exclude VAT.