LCL vs full container: break-even volume
Compares the cost of delivering a shipment as less-than-container load (a rate per cubic meter plus consolidation) and as a full container (the rate plus extra costs), finds the volume at which the container becomes cheaper and counts the cost per piece. Extra waiting days for a consolidated load can be included. Rates are entered in one currency.
At a glance
- What question does it answer?
- Whether LCL or a container is cheaper and at which volume the choice flips.
- What data is needed?
- Container and LCL rates and consolidation.
- How to read the result?
- Compare cost, break-even volume and container fill; near the threshold the term decides. Example on the default values: LCL: RUB 3,760; Full container: RUB 6,100; Cheaper: LCL; Difference: RUB 2,340. The figures are illustrative: enter your own to see your result.
Why and how to reason
LCL pays off while the shipment is small: in the example at 38 m³ it costs 3,760 against 6,100 for a container; the container wins from 62.6 m³.
When to use it
Apply when planning a shipment and comparing carriers’ offers. It supplements “Air or sea” and “Container detention”.
How to read the result
Look at the break-even volume and the container fill; near the threshold the term decides, so enter the waiting days.
Common mistakes
They compare rates without volumetric weight, ignore downtime and take the volume from the rated figure rather than the layout.
What data is needed?
- Container and LCL rates and consolidation.
- Shipment volume and usable container volume.
- Waiting days and the cost of a day.
Inputs
| Field | Unit | Value in the example | Meaning |
|---|---|---|---|
| Container rate | ₽ | 5,800 | The freight of one container on your route; LCL and container rates in the same currency. The example value is illustrative. |
| Container extra costs | ₽ | 300 | Terminal, loading, clearance per container. The example value is illustrative. Optional. Empty: the field is ignored (counted as zero in sums). |
| LCL rate per m³ | per m³ | 95 | Per cubic meter or tonne, whichever is larger: enter per m³ here. The example value is illustrative. |
| LCL consolidation | ₽ | 150 | A fixed charge for consolidating and deconsolidating the shipment. The example value is illustrative. Optional. Empty: the field is ignored (counted as zero in sums). |
| Shipment volume | m³ | 38 | The volume of the packed cartons, not the weight. The example value is illustrative. |
| Usable container volume | m³ | 68 | With real loading: less than the rated volume. The example value is illustrative. |
| Pieces per m³ | pcs | 500 | From the “Packing density” calculation: carton and pieces in it. The example value is illustrative. |
| Extra waiting days of an LCL load | days | 0 | Optional: how many days longer an LCL load takes to consolidate and deconsolidate. The example value is illustrative. |
| Cost of a day of delay | ₽ | 0 | Optional: lost sales, cost of money and downtime for one day. The example value is illustrative. |
How it is calculated
| Step | Formula |
|---|---|
| Container | number of containers × (rate + extra costs); number = volume ÷ usable volume, rounded up |
| LCL | rate per m³ × volume + consolidation + delay days × cost of a day |
| Break-even volume | (container rate + extra − consolidation − delay) ÷ rate per m³ |
| Per piece | cost ÷ (volume × pieces per m³) |
Worked numbers
Default values from the app; in the interactive version you enter your own.
- LCL
- 3,760 ₽Rate × volume + consolidation + delay.
- Full container
- 6,100 ₽Number of containers × (rate + extra costs).
- Cheaper
- LCL
- Difference
- 2,340 ₽
- Break-even volume for one container, m³
- 62.6(Container − consolidation − delay) ÷ rate per m³.
- Container fill
- 55.9 %
- Per piece: LCL
- 0.198 ₽
- Per piece: container
- 0.321 ₽
- LCL
- Container
Data as a table
| Measure | LCL | Container |
|---|---|---|
| 17 | 1,765 | 6,100 |
| 34 | 3,380 | 6,100 |
| 38 | 3,760 | 6,100 |
| 51 | 4,995 | 6,100 |
| 68 | 6,610 | 6,100 |
Comparison by volume, m³
| Volume, m³ | LCL | Container | Cheaper |
|---|---|---|---|
| 17 | 1,765 ₽ | 6,100 ₽ | LCL |
| 34 | 3,380 ₽ | 6,100 ₽ | LCL |
| 38 | 3,760 ₽ | 6,100 ₽ | LCL |
| 51 | 4,995 ₽ | 6,100 ₽ | LCL |
| 68 | 6,610 ₽ | 6,100 ₽ | container |
Now LCL is cheaper, the difference is 2,340 ₽. Check the volumetric weight and the carrier’s rates against the invoice: this is only rate arithmetic.
What to do with the result: if the volume is close to the threshold, add the waiting days and the cost of delay and then decide; near the threshold the term decides, not the rate. A typical mistake: comparing rates without volumetric weight and without downtime.
Nuances and limits
- Comparing rates without volumetric weight.
- Ignoring downtime.
- Counting volume by the rated figure.