The swatch and trim card and the materials order: the composition of the card, consumption, losses and shrinkage, packing and the minimum lot, the order date, approval and the table template
How to put together the swatch and trim card of a model and turn it into a materials order: which rows and fields it needs, how to count the need with losses and shrinkage and how to account for the roll and the minimum lot. Then: by which week to place the order and who approves each material. The document decides how much fabric and how many trims to order and when, so that everything is at the factory warehouse by the cutting start and the surplus does not turn into frozen money.
Why this document
The swatch and trim card links the pattern maker, the technologist, purchasing and the factory: until it is approved the materials are not ordered, and once it is approved the order is counted by it. An error in consumption or shrinkage shows in money and in time: a shortage stops sewing, a surplus stays in the warehouse. The product manager, the technologist, the materials buyer and the brand’s CFO read the document before launching a batch. It gives one order: the rows of the card, the need calculation, the order with packing and the minimum lot, the date and the approval statuses, and also a table template for work.
At a glance
- What is this document and why is it needed?
- How to put together the swatch and trim card of a model and turn it into a materials order: which rows and fields it needs, how to count the need with losses and shrinkage and how to account for the roll and the minimum lot. Then: by which week to place the order and who approves each material. The document decides how much fabric and how many trims to order and when, so that everything is at the factory warehouse by the cutting start and the surplus does not turn into frozen money.
- Who owns the document and how often is it rebuilt?
- The technologist keeps the card, the materials buyer counts the order and the dates, the product manager approves the materials, the CFO agrees the sum; the card is updated in versions when the consumption, price or supplier changes and is frozen before the cutting start.
- What mistakes are the most common?
- Brand: shrinkage is not put into the purchase → after washing and cutting there is not enough fabric → count the need with a division by one minus shrinkage. Brand: the marker losses and the defect losses are counted twice in one column → surplus fabric and frozen money → separate them and record in the card where the losses come from. Retailer: for a private label it was not agreed whose surplus of materials it is → after the batch the remnant is disputed → write the owner of the surplus and the procedure for its use into the contract.
For whom
- Brand
- A brand keeps a card for every model and color, buys materials for the factory or supplies them as tolling material: it needs consumption, losses and shrinkage, minimum lots, lead times and the approval statuses of samples and color.
- Retail
- A retailer more often does not buy materials; if it develops a private label it needs a simplified card: the composition, the width, the color, the tolerances and the tests the factory must meet, while the factory runs the materials purchase itself.
What it consists of
What is in the card
- The swatch and trim card is a table of all the materials and trims of one model: what goes into the garment, from where, how much, at what price and in what approval status. One card instead of correspondence with the factory and suppliers.
- The header: the model, the season, the size range and the colors, the number of garments, the version and date, the person responsible. A material row: the swatch, the name and the supplier’s SKU, the color, the composition, the width, the density, the place in the garment, consumption per garment, the unit, losses, shrinkage, the price, the packing, the minimum lot, the lead time, the status and the test result.
- Brand: keep one card per model and color with versions; the factory and purchasing work by the approved version and any change of consumption or supplier is made as a new version with a date.
- Retailer: for a private label set the supplier a standard of the card: the mandatory fields, the tolerances for composition, density and shrinkage, the tests and a reference sample; compare the card received with the reference before sewing starts.
Consumption and losses
- The consumption per garment is set by the marker: it depends on the size, the fabric width and the direction of the pattern. For a size range the weighted average consumption is taken by the share of every size in the batch and not the consumption of the middle size.
- The losses in the column of the card are roll defects, fitting and samples; the between-pattern losses of the marker are already inside the consumption by the marker. Do not count the same losses twice: a double reserve turns into surplus fabric.
- Brand: take the consumption from the factory’s or your own pattern department’s approved marker, the losses from the history of past lots of this fabric; if there is no history set an illustrative value and revise it by the actual lot.
- Retailer: if the factory buys the materials itself, ask it for the consumption norm and compare it with your estimate by the marker; a discrepancy in the norm turns into the price of a garment.
Shrinkage, packing and the minimum lot
- Shrinkage goes into the fabric purchase: the length to buy equals the consumption divided by one minus shrinkage. The need is multiplied by this factor, so three percent of shrinkage adds about three percent of fabric to the purchase.
- Packing (a roll, a pack, a spool) makes the order a multiple: the order is rounded up to the packing. The supplier’s minimum lot sets the lower bound: if the need is below the minimum the minimum is ordered and the surplus is paid for.
- Brand: count the cost of the surplus for every item and decide in advance where it will go (the next batch, another model, a sale of the remaining stock); unify fabrics between models so that several garments use up the minimum lot.
- Retailer: for a private label agree with the factory whose surplus it is: if the materials are ordered for your batch the remnant remains your risk and must be set out in the contract.
The order date and approval
- The order week equals the week the cutting starts minus the lead time in weeks, rounded up; weeks for the lab sample of color, the shrinkage test and the roll check are added to the schedule. The longest lead time sets the critical path of the order.
- The material statuses: sample, color approved, shrinkage test passed, price and lead time confirmed, ordered, received, checked. The order is placed only for the rows with the status “approved”; an unapproved row stays in the card as a risk.
- Brand: order the materials with the longest lead time first and keep the actual arrival date for each row; a delay of one trim stops the sewing of the whole batch.
- Retailer: for a private label ask the factory for the schedule of material arrivals and compare it with the launch date: a miss on fabric shifts the delivery to the stores and the season window.
The template of the card and order table
- The template “Swatch and trim card”: model; color; position; material; supplier SKU; composition; width, cm; density, g/m²; place in the garment; consumption per garment; unit; losses, %; shrinkage, %; approval status; test result; version; date.
- The template “Materials order”: item; unit; need; packing; minimum lot; order; surplus; price without VAT; sum; supplier; lead time, weeks; order week; confirmation date; arrival date; acceptance status.
Where the data comes from
| Data source | Fields |
|---|---|
| The marker and the technical description | consumption by size, width, the direction of the pattern, the place of the material in the garment |
| The history of lots and the laboratory | losses of past lots, shrinkage by a sample, test results, the approved color |
| Supplier offers | the price without VAT, the packing, the minimum lot, the lead time, the payment terms |
| The production plan | the number of garments by size and color, the week the cutting starts, the factory |
How to build it step by step
- Step 1: Brand: put together the header and the rows of the card by model and color and attach the samples; enter the consumption by the approved marker.
- Step 2: Brand: enter the losses and shrinkage: the losses by the history of lots, shrinkage by a sample; do not duplicate the marker losses.
- Step 3: Get the price, the packing, the minimum lot and the lead time from the suppliers and enter them for every row.
- Step 4: Count the need by the formula with losses and shrinkage for every item for the number of garments in the batch.
- Step 5: Determine the order: not below the minimum lot and a multiple of the packing; count the surplus and its cost.
- Step 6: Brand: decide for the items with a surplus what to do with it and compare the order sum with the purchase budget and the cost of a garment.
- Step 7: Determine the order week by the lead time from the week the cutting starts; check that no row has gone into the past.
- Step 8: Retailer: for a private label get the card and the arrival schedule from the factory and compare them with the reference and the launch date.
- Step 9: Place the order for the approved rows, check the arrival (see the reference of fabrics and trims) and close the version of the card.
Formulas
| Measure | Formulas | Note |
|---|---|---|
| Need | N = garments × consumption × (1 + losses) ÷ (1 − shrinkage) | Losses without the between-pattern ones, shrinkage only for fabrics. |
| Order and surplus | Q = rounded up to the packing from max(N; minimum lot); surplus = Q − N | The surplus in money equals the surplus multiplied by the price. |
| Weighted average consumption by size | c = Σ (share of the size × consumption of the size) | The size shares are taken from the batch plan. |
| Order week | Order week = the cutting week − the lead time, rounded up | For the longest lead time the order week is the earliest. |
Formulas in notation
- Order
Q = ⌈ max(N, M) / k ⌉ · k
M: the minimum lot; k: the packing (a roll, a pack); ⌈ ⌉: rounding up; the surplus = Q − N.
Worked example
An illustrative card: a shirt-jacket, a batch of 1,200 garments, cutting in week 36
| Material | Need | Order | Surplus | Order sum, RUB | Order week |
|---|---|---|---|---|---|
| Shell: cotton-polyester twill | 2,753.8 | 2,760 | 6.2 | 1,159,200 | 28 |
| Lining | 1,671.4 | 1,700 | 28.6 | 255,000 | 30 |
| Fusible interlining | 589.1 | 600 | 10.9 | 66,000 | 31 |
| Zipper | 1,224.0 | 1,250 | 26.0 | 47,500 | 31 |
| Buttons | 8,652.0 | 8,700 | 48.0 | 39,150 | 32 |
| Thread | 504.0 | 504 | 0.0 | 27,720 | 33 |
| Composition and care label | 1,236.0 | 1,300 | 64.0 | 3,900 | 33 |
| Logo patch | 1,236.0 | 2,000 | 764.0 | 24,000 | 30 |
Illustrative data. The minimum lot of the patch (2,000) exceeds the need (1,236): a surplus of 764 pcs costs RUB 9,168. The shell fabric sets the earliest order week, the 28th.
Figures
- Need
- Surplus
Data as a table
| Measure | Need | Surplus |
|---|---|---|
| Shell: cotton-polyester twill | 1.16m | 2,598 |
| Lining | 251k | 4,286 |
| Fusible interlining | 64.8k | 1,200 |
| Zipper | 46.5k | 988 |
| Buttons | 38.9k | 216 |
| Thread | 27.7k | 0 |
| Composition and care label | 3,708 | 192 |
| Logo patch | 14.8k | 9,168 |
The materials order by item: need and surplus in money. The shell fabric gives the main part of the order; the surplus is noticeable for the patch (the minimum lot) and the lining (the roll).
Material lead times before the cutting start. The shell fabric takes 8 weeks and sets the earliest order date; the other materials are ordered later but for the same cutting week.
| Stage | Start, weeks from the earliest order | Length, weeks from the earliest order |
|---|---|---|
| Shell: cotton-polyester twill | 0 | 8 |
| Lining | 2 | 6 |
| Fusible interlining | 3 | 5 |
| Zipper | 3 | 5 |
| Buttons | 4 | 4 |
| Thread | 5 | 3 |
| Composition and care label | 5 | 3 |
| Logo patch | 2 | 6 |
The path of a material: from a sample to acceptance. The order is placed after the sample, color and test are approved; after arrival the material is checked and only then released to cutting.
- Sample and card → Color and test approved
- Color and test approved → Order to the supplier
- Order to the supplier → Arrival and acceptance
- Arrival and acceptance → Cutting
- Cutting
Specifics by category
- Apparel
- Apparel: the main items are the shell fabric, the lining, the interlining, the zipper, buttons, threads and labels; losses and shrinkage differ between fabrics, so each has its own row. For outerwear the insulation and windproof parts are added to the card, for light clothing they are absent.
- Footwear
- Footwear: instead of meters square decimeters of leather by parts, pairs of soles and lasts, trims and packaging are counted; the minimum lots for soles and lasts are high, so the card is made for a series and not for a pair.
- Accessories
- Accessories: parts and hardware are the main thing, there is little fabric; consumption is measured in pieces, the minimum lots for hardware are large and one type of hardware works in several items: unification lowers the surplus. For jewelry the card includes metal, stones and assay requirements that this document does not cover: check them separately.
- Kids
- Children’s: consumption per garment is small but the size range is wide and the batches per size are small: count a weighted average consumption and watch that the minimum lot does not exceed the need many times; trims are checked against the safety requirements.
- Men
- Men’s: more lining, interlining and dense fabrics, the consumption per garment is higher; buttons and zippers are loaded more; large sizes need their own consumption and not the average for the range. For suits separate rows for the jacket and the trousers, and the lining and interlining cost noticeably more than the shell.
- Women
- Women’s: more thin fabrics and knits, a wider color palette and therefore more minimum lots per color; count the lot of material per color and not in total per model, and unify fabrics between models.
Common mistakes
- Brand: shrinkage is not put into the purchase → after washing and cutting there is not enough fabric → count the need with a division by one minus shrinkage.
- Brand: the marker losses and the defect losses are counted twice in one column → surplus fabric and frozen money → separate them and record in the card where the losses come from.
- Retailer: for a private label it was not agreed whose surplus of materials it is → after the batch the remnant is disputed → write the owner of the surplus and the procedure for its use into the contract.
- Retailer: the factory’s material arrival schedule is not compared with the launch date → delivery to the stores shifts → ask for the schedule and the control dates for the critical materials.
- The minimum lot is not compared with the need → the surplus of an item is paid for → count the surplus in money for each row and unify materials between models.
Russian specifics
- Brand: keep the prices in the card and the order without VAT; the VAT rate of 22% applies to the purchase of materials by the general rules, check the procedure for deducting input VAT with the accountant, unverified.
- Retailer: if the materials are passed to the factory as tolling material the accounting and the contract follow the rules of processing (see the document on tolling); check the terms and the tax consequences with a lawyer and an accountant, unverified.
- The composition and care label on the garment must match the actual composition of the materials from the card: TR CU 017/2011. Rule: CU Commission decision 876 of 09.12.2011: TR CU 017/2011 on safety of light-industry products (Customs Union Commission Decision of 09.12.2011 No. 876).