Sourcing manager
Finds and assesses factories and materials, compares offers by full cost and keeps supply risk within the season.
About the role
The sourcing manager finds and assesses factories and materials and keeps supply within the season on price, quality and lead time. The result is not the lowest price in an offer but the lowest full cost per unit allowing for minimum order, waste, logistics, duty, exchange rate and defect risk. Choosing a factory is a bet on reliability and it is assessed by a scorecard with weights and red flags.
The role works with the collection product manager, PLM, purchasing and finance. The product manager sets what is needed, PLM supplies the tech pack and specification, and sourcing finds where and on what terms to make it. It compares a near and a far site, decides whether air speed-up pays back and agrees the AQL inspection plan. For imports it accounts for customs value, duty, VAT and exchange rate, and checks norms with a broker and an accountant.
A good sourcing manager does not argue about price in a vacuum: it brings offers to one base and shows what each week and each percent of defects costs.
A working day
The day starts with order statuses: what is in production, what has reached inspection, where lead times slip. Then talks with factories and comparison of new offers. In the afternoon agreement of fabric and color minimums, inspection and logistics plans. In the evening the scorecard is updated and risks are recorded.
Documents: commercial offers and specifications, factory contracts, the order and delivery schedule, inspection acts and quality records, invoices and customs documents, the landed cost calculation.
Typical decisions
- Which factory to choose when the score leader has a red flag.
- Which offer to take after bringing to full cost per unit.
- Whether to order nearer but dearer for speed and a small run.
- Whether to speed up a batch by air for the weeks of sales won.
- Which inspection plan and sample to choose at this factory.
- How to build exchange rate, duty and VAT into the purchase price.
Study path
- Factory choice and quality: scorecard, comparison and the price of risk. Choosing a factory and quality
- The factory scorecard: scores, weights and red flags. Factory scorecard
- Comparing offers by full cost per unit. Comparing quotes: CMT, FOB, full package
- Far and near site: the break-even premium. Far and near factory: break-even premium
- Air or sea: does the speed-up pay back. Air or sea: does speeding up pay
- The AQL inspection plan: sample and acceptable defects. Sampling inspection and cost of defects
- Production and import: full landed cost, duty and exchange rate. Production and import
- The sourcing route: the order of study. Factory and supply
What to understand
- A scorecard instead of an impression
- A factory is compared by weighted criteria: quality, lead time, price, flexibility, compliance. A red flag on a critical item excludes the factory whatever the total score.
- Offers on one base
- A unit price without MOQ, tooling, waste and logistics says nothing. Compare offers by full cost per unit and include the minimum order.
- Fabric and color MOQ
- The minimum per fabric and per color can exceed your order per style. Material unification lowers the number of fabric SKUs and the risk of leftovers.
- Near or far site
- A far factory is cheaper per unit, a near one faster and more flexible. Compute the break-even premium for proximity: how much you will pay for speed and a small run.
- Air or sea
- Air speed-up pays back if the weeks won at full price bring more than the freight surcharge. The decision is taken for a specific batch.
- Sampling inspection
- An AQL inspection plan sets how many units to check and what defect level is acceptable. A weak sample lets defects pass, an excessive one eats time and money.
- Import, EAEU and exchange rate
- Customs value, duty, import VAT and the exchange rate form full cost. Check rates and procedure against current norms with a customs broker and an accountant (verify currency as of 14.11.2026).
Key measures
| Measure | Formula | How to read |
|---|---|---|
| Factory total score | Sum of (criterion score × weight) with no red flags | The leader with no red flags, not simply the highest sum. |
| Full cost per unit | Price + tooling per unit + waste + logistics + duty + cost of money | Compare offers only by this number. |
| Gap to target cost | Best offer − target cost | A positive gap is a reason to negotiate, change material or the shelf price. |
| Break-even premium for proximity | Gain from speed and small run ÷ units | If the actual premium is higher, the near site does not pay back. |
| Air pay-back | Profit of weeks won − air surcharge | A positive value justifies speeding up the batch. |
| Defect share at inspection | Defective units in the sample ÷ sample size | Compare with the acceptable level of the inspection plan and the trend by factory. |
Questions the role asks
- Which factory leads on scores and does it have red flags? Factory scorecard
- Which offer is cheaper when everything is brought to full cost per unit? Comparing quotes: CMT, FOB, full package, Supplier terms: total cost of buying per unit of demand
- Is our batch enough for the fabric and color minimum? Color and fabric MOQ, Unit price by run tiers and the minimum run
- Will a near site pay back allowing for speed and a small run? Far and near factory: break-even premium
- What does air speed-up give for this batch? Air or sea: does speeding up pay
- Which inspection plan to choose and how many units to check? Sampling inspection and cost of defects
- What does import cost per unit with duty, VAT and exchange rate? Customs value and Incoterms, Landed cost by style: spreading the shipment, Exchange rate and duty scenario: what happens to margin
Route through Lab
- Choosing a factory and quality
- Factory scorecard
- Comparing quotes: CMT, FOB, full package
- Supplier terms: total cost of buying per unit of demand
- Color and fabric MOQ
- Far and near factory: break-even premium
- Air or sea: does speeding up pay
- Sampling inspection and cost of defects
- Production and import
- Landed cost of an imported item
- Customs value and Incoterms
- Customs and regulation
- Import from the EAEU or from a third country: duty, VAT and the full cost
- Factory and supply
- A trial batch at a supplier: when the trial pays off, what a mistake without it costs and at what probability of defects it breaks even
First 30 days
- Open the scorecard and check the criterion weights. Factory scorecard
- Bring two current offers to full cost per unit. Comparing quotes: CMT, FOB, full package
- Check fabric and color minimums for the nearest order. Color and fabric MOQ
- Calculate whether a near site pays back. Far and near factory: break-even premium
- Review the inspection plan on the last batch. Sampling inspection and cost of defects
- Build the full import cost of one style. Landed cost of an imported item
- Open the sourcing route. Factory and supply
Common mistakes
- Choosing a factory by unit price without MOQ, waste and logistics.
- Ignoring a red flag because the total score is high.
- Not checking the fabric and color minimum before confirming the order.
- Deciding on air in general rather than for a specific batch and dates.
- Not building exchange rate and duty into cost and learning of them at import.
Reports to keep
- Factory scorecard: Scores by criterion, red flags and trend for each factory.
- Offer comparison: Full cost per unit by offer and the gap to target.
- Delivery quality: Defect share and OTIF by factory and batch.
Data to keep
- Supplier reference: lead times, MOQ, payment terms. ERP and accounting system; Visitor counters
- Factory offers and full cost calculation. ERP and accounting system; PLM and production records
- Import data: invoice, rate, duty, logistics. ERP and accounting system; Bank and treasury; E-documents: transfer notes, contracts