Label launch: from an idea to the first sales — stages, documents, calculations in order and readiness criteria
The route puts eight stages of a label launch into one sequence: the brand platform, the segment and market size, the collection and price, production and the first batch, channels and unit economics, the calendar and media plan, buyers and wholesale, launch and first sales. For each stage the Lab documents, the calculations in order and the readiness criteria by which they decide whether to move on are named. The through case is shared: an illustrative women’s apparel label with a shelf price of RUB 7,320 with VAT and a first batch of 1,200 units. This is the route of the whole label; a single item on a platform in 30 days is led by the document “Launching an item in 30 days”.
Why this document
Newcomers launch a label in pieces: first a beautiful collection, then it turns out that the price does not add up, the batch does not match the segment and the buyer has nothing to be shown. The route puts the steps in an order where the result of one is needed by the next and gives gates: until the critical tasks of a stage are closed they do not move on. It is read by the founder, the launch producer, the CFO and a retailer who launches an own label: for them the route is the same but the roles and the money differ.
At a glance
- What is this document and why is it needed?
- The route puts eight stages of a label launch into one sequence: the brand platform, the segment and market size, the collection and price, production and the first batch, channels and unit economics, the calendar and media plan, buyers and wholesale, launch and first sales. For each stage the Lab documents, the calculations in order and the readiness criteria by which they decide whether to move on are named. The through case is shared: an illustrative women’s apparel label with a shelf price of RUB 7,320 with VAT and a first batch of 1,200 units. This is the route of the whole label; a single item on a platform in 30 days is led by the document “Launching an item in 30 days”.
- Who owns the document and how often is it rebuilt?
- Kept by the founder or the launch producer; a stage’s checklist is opened at the start of the stage, the gates are checked at a weekly review; the result (readiness and the blocker) is shown to the CFO and the investor.
- What mistakes are the most common?
- Brand: Start with a collection and return to the platform and the price: samples are sewn for a buyer who does not exist and the money is spent twice. Brand: Order a batch equal to the factory’s minimum run without checking against demand: SOM speaks about units, MOQ about the factory’s possibilities. Brand: Mark almost all tasks as critical: the threshold stops working and the blocker turns into “everything”.
For whom
- Brand
- For a brand the route is a path from an idea to the first sales: it is responsible for the collection, production, channels and buyers, and the gates protect the money of the first batch.
- Retail
- For a retailer’s own label the route is the same but production goes through the store’s supplier, and the channels and buyers are the chain and the platform; the gates protect against a label that the shelf does not need.
What it consists of
Stage 1. Idea and brand platform
- Documents: “Brand platform: a one-page working template and a readiness checklist”, “Brand platform and positioning”, “Market research”.
- Calculations in order: price, markup and margin; the price index to the market by the price position among competitors.
- Readiness criteria: the platform on one page; five interviews; three proofs with a sample or a document; the margin and the price index counted. Critical: the platform, the interviews, the margin.
- Brand: The founder writes the page himself rather than delegating to an agency: price, collection and content later pass through it.
- Retailer: For an own label the role in the category and boundaries are added: what the label does not do so as not to compete with the store’s suppliers.
Stage 2. Segment and market size
- Documents: “Target audience segmentation and segment size: TAM, SAM and SOM”, “Market research”, “Market pyramid”.
- Calculations in order: segment size (TAM, SAM, SOM in two ways); the target cost of the first order is taken from a pilot.
- Readiness criteria: three segments with the number of people and shares; the two SOM estimates are reconciled (the gap is explained); the batch is checked against the demand. Critical: the two SOM estimates and the decision on the batch.
- Brand: The share of the price segment is checked with a survey and the cost of the first order with a pilot: without them SOM stays a hypothesis.
- Retailer: The segment is taken from the store’s CRM and checked against how many of the store’s buyers the new label gives.
Stage 3. Collection, price and cost
- Documents: “Assortment matrix and range plan”, “Price list and costing (landed cost)”, “Retail math by segments”.
- Calculations in order: the allowable cost from the shelf price; the cost by specification; price, markup and margin; the collection plan in money; the price position among competitors.
- Readiness criteria: a matrix of 8–10 models; the target and the actual cost are reconciled; the margin is not below the set one; the price ladder is checked. Critical: the cost, the margin, the price.
- Brand: The price is set from the buyer, then the allowable cost is counted; the reverse order gives a price that will not be bought.
- Retailer: For an own label the price is checked against the brands on the shelf and the category IMU; the label must not take a brand’s price without its quality.
Stage 4. Production and the first batch
- Documents: “Sourcing from factories: CMT, FOB, OEM/ODM, full cost and terms”, “Tech pack”, “Samples and laboratory tests”, “AQL and batch quality inspection”, “Certification, declaration and marking”.
- Calculations in order: the price of an item by batch steps and the minimum batch; fabric color and MOQ; the collection calendar; acceptance by sample; the starting model of a brand; the collection break-even.
- Readiness criteria: the sample is approved; the tech pack is passed on; declarations and marking are drawn up; the batch by the batch step is not above SOM with a reserve; the money for the start is collected. Critical: the sample, the documents, the money.
- Brand: The batch is determined by demand and money, not by the factory’s minimum run; if MOQ is above demand, change the factory or the model, not the sales plan.
- Retailer: An own label goes through the store’s approved supplier: acceptance, documents and marking are fixed in the contract.
Stage 5. Channels and unit economics
- Documents: “Unit economics (CM1, CM2, CM3) with redemption”, “Marketplace economics”, “Starting on a platform”.
- Calculations in order: marketplace unit economics and the break-even price; contribution levels CM1–CM3 by channels with redemption.
- Readiness criteria: for each channel the contribution CM2 is not below zero; cards and content are ready; the platform terms and the contract are read. Critical: the contribution CM2, the contract.
- Brand: One or two channels with counted economics are switched on first, not all at once: every channel has its own returns and logistics.
- Retailer: The channel of an own label is the chain of stores and the store’s site; the economics are counted by the chain’s contribution levels.
Stage 6. Calendar and media plan
- Documents: “Marketing launch calendar and a media plan with a budget”, “Marketing channels in Russia”, “Production and content”.
- Calculations in order: the annual media plan (budget, orders, revenue, ad-cost share, payback); the marketing goal and funnel; the campaign ROMI.
- Readiness criteria: the calendar is tied to delivery dates; the budget is approved; the cost of an order is checked with a pilot; advertising marking is set up. Critical: the budget, the pilot, the marking.
- Brand: A pilot on a small budget in two channels gives a real cost of an order; without it the media plan is built on someone else’s figures.
- Retailer: For an own label the media plan goes into the store’s calendar; the budget is agreed with the category manager.
Stage 7. Buyers and wholesale
- Documents: “A buyer session: the brand scorecard, the agenda and the order terms”, “Wholesale documents”, “Commercial terms”.
- Calculations in order: the brand scorecard for a buyer; buyout or commission; the economics of a brand at a retailer; the price of deferral and the early-payment discount.
- Readiness criteria: the line sheet, price list and samples are ready; the scorecard is filled for yourself; weak criteria are closed with terms; a trial order with a review date. Critical: the line sheet, documents, terms.
- Brand: Come to the buyer with the store’s economics ready at the recommended retail price and with terms that lower its risk.
- Retailer: The buyer of an own label assesses it by the same scorecard as other brands so as not to give it leniency.
Stage 8. Launch and first sales
- Documents: “Purchase budget (OTB)”, “Excel for retail, part I” and “part II”, “Store KPI pack”.
- Calculations in order: the sell-through rate and the risk of stock; the control week; the 13-week cash plan; the label launch readiness; the purchase budget.
- Readiness criteria: the control week is set; the full-price sell-through is counted weekly; the 13-week cash plan has no gap; a decision on a reorder or a price reduction follows the rules. Critical: the control week, the cash plan.
- Brand: In the first weeks they look not at revenue but at sell-through, returns and money: these tell whether a reorder is needed.
- Retailer: An own label gets the same control points as brands: the rate, returns, the margin after discounts and a decision on the range.
Where the data comes from
| Data source | Fields |
|---|---|
| Stage results | The platform, SOM, cost, sample, declarations, unit economics, budget, scorecard. |
| Stage checklists | The number of tasks, critical tasks, completion marks, the date of the check. |
| Money and terms | The starting budget, the batch, the delivery schedule, the 13-week cash plan. |
How to build it step by step
- Step 1: Brand: open the checklist of stage 1 and enter the critical tasks: without them you cannot move on; keep the number of tasks of each stage within a dozen.
- Step 2: Set the readiness threshold for ordinary tasks; all critical ones are done anyway.
- Step 3: Go through the stages in order; write the result of a stage as a number: SOM, cost, margin, the cost of an order, scorecard points.
- Step 4: Retailer: for an own label add the role in the category, the store’s supplier and agreements with your category manager.
- Step 5: Once a week count readiness: the overall one, by critical tasks, the number of ready stages and the blocker.
- Step 6: If the blocker does not move for two weeks, review the launch date or the composition of critical tasks, not the threshold.
- Step 7: Brand: until stage 4 is closed run stages 6 and 7 in a preparatory mode: without a sample and a batch there is nothing to sell.
- Step 8: Retailer: the decision to launch the label is taken by a committee on the results of the scorecard and unit economics; the gates are recorded in the minutes.
- Step 9: After the first weeks of sales return the results to stages 2, 3 and 5: the segment, the price and the unit economics are updated with facts.
Formulas
| Measure | Formulas | Note |
|---|---|---|
| Stage readiness | readiness = done ÷ total tasks × 100 | It is counted separately for critical tasks as well. |
| The stage is ready | all critical done and done ≥ round up(tasks × threshold) | The threshold is illustrative, 80% by default. |
| How many tasks are missing | missing = max(needed to reach the threshold − done; critical − critical done) | The first stage in order that is not ready blocks. |
Worked example
Readiness of the route stages, an illustrative case (threshold 80%)
| Stage | Tasks | Done | Critical | Critical done | Readiness, % | Status |
|---|---|---|---|---|---|---|
| 1. Idea and brand platform | 6 | 6 | 3 | 3 | 100 | ready |
| 2. Segment and market size | 5 | 5 | 2 | 2 | 100 | ready |
| 3. Collection, price and cost | 10 | 8 | 4 | 4 | 80 | ready |
| 4. Production and the first batch | 12 | 7 | 6 | 4 | 58 | blocks |
| 5. Channels and unit economics | 8 | 4 | 3 | 2 | 50 | ahead |
| 6. Calendar and media plan | 7 | 2 | 2 | 1 | 29 | ahead |
| 7. Buyers and wholesale | 6 | 0 | 2 | 0 | 0 | ahead |
| 8. Launch and first sales | 9 | 0 | 4 | 0 | 0 | ahead |
| Total | 63 | 32 | 26 | 16 | 51 | stages ready: 3 |
Overall readiness 51%, by critical tasks 62%, 3 stages of 8 are ready. The blocker is “4. Production and the first batch”: 7 of 12 done, critical 4 of 6; 3 tasks are missing before it is ready (the threshold requires 10 done). 31 tasks are left, of them critical 10. Stages 6–8 are not launched without critical readiness until stage 4 is closed. All numbers are illustrative.
Figures
The launch route by weeks, an illustrative example. Stage 4 is the longest and sets the term of the whole launch; stages 5–7 partly run in parallel but not before the sample is ready. The terms are illustrative: every label has its own, depending on the factory, season and budget.
| Stage | Start, weeks | Length, weeks |
|---|---|---|
| 1. Idea and brand platform | 0 | 3 |
| 2. Segment and market size | 3 | 2 |
| 3. Collection, price and cost | 5 | 6 |
| 4. Production and the first batch | 11 | 20 |
| 5. Channels and unit economics | 16 | 6 |
| 6. Calendar and media plan | 22 | 12 |
| 7. Buyers and wholesale | 30 | 8 |
| 8. Launch and first sales | 38 | 14 |
- All tasks
- Critical
Data as a table
| Measure | All tasks | Critical |
|---|---|---|
| 1. Idea and brand platform | 100 | 100 |
| 2. Segment and market size | 100 | 100 |
| 3. Collection, price and cost | 80 | 100 |
| 4. Production and the first batch | 58 | 67 |
| 5. Channels and unit economics | 50 | 67 |
| 6. Calendar and media plan | 29 | 50 |
| 7. Buyers and wholesale | 0 | 0 |
| 8. Launch and first sales | 0 | 0 |
Stage readiness: all tasks and critical ones, %. The first three stages are closed; stage 4 stands on the border while stages 6–8 have not yet started on critical tasks.
Gates between stages. Every transition goes through a gate: critical tasks and the threshold; the blocker returns work to the stage where the gate is not passed.
- Platform → Segment
- Segment → Collection and price
- Collection and price → Production
- Production → Channels
- Channels → Media plan
- Media plan → Buyers
- Buyers → Launch
- Launch
Specifics by category
- Apparel
- In apparel the longest stage is samples and fit: several iterations on patterns and the size run. Critical tasks of stage 4: an approved sample in different sizes, the tech pack, the declaration and marking; the batch is made by the size curve, not in equal parts.
- Footwear
- In footwear the launch is heavier: the last, molds and minimum batches are more expensive, and the size grid and wear testing add critical tasks. Stage 4 is longer and the first batch is usually smaller by models and wider by sizes; the money for the start is higher.
- Accessories
- In accessories the launch is shorter and cheaper: fewer sizes, a faster sample, a lower minimum batch, but higher requirements for material, hardware and packaging. Critical tasks of stage 3 include the material and hardware, and stage 6 is built around gift peaks.
- Kids
- In children’s the route widens to safety: certification under TR CU 007/2011, material checks and a size run by height are among the critical tasks of stage 4. The platform and the segment are counted by parents, and the ban on unverifiable health claims stands at stage 1.
- Men
- In the men’s segment the route is shorter in content and trend and longer in fit and the delivery reliability of basic positions. The first batch is built around basics, and stage 7 with buyers matters more: men more often buy in a store and on a platform than under advertising.
- Women
- In the women’s segment the route is wider in range and content: a capsule of several looks, more sizes and colors, a stronger influence of bloggers. Critical tasks of stage 3 include the size policy and stage 6 a calendar around seasons and looks; the first batch is better made as a capsule rather than a single model.
Common mistakes
- Brand: Start with a collection and return to the platform and the price: samples are sewn for a buyer who does not exist and the money is spent twice.
- Brand: Order a batch equal to the factory’s minimum run without checking against demand: SOM speaks about units, MOQ about the factory’s possibilities.
- Brand: Mark almost all tasks as critical: the threshold stops working and the blocker turns into “everything”.
- Brand: Go to a buyer without a sample, a declaration and the store’s economics: the scorecard stops at the stop criterion on documents.
- Retailer: Launch an own label without a role in the category and boundaries: it takes sales from brands and does not create new demand.
- Retailer: Give an own label leniency in the scorecard: the assessment stops being a comparison and the decision a basis.
Russian specifics
- Brand: Light industry is subject to conformity confirmation under TR CU 017/2011 and marking; the requirements depend on the product group and are checked before ordering a batch. Rule: CU Commission decision 876 of 09.12.2011: TR CU 017/2011 on safety of light-industry products (Customs Union Commission Decision of 09.12.2011 No. 876).
- Brand: Children’s goods are confirmed under TR CU 007/2011; certification and tests are included in the terms and budget of stage 4. Rule: CU Commission decision 797 of 23.09.2011: TR CU 007/2011 on safety of products for children and adolescents (Customs Union Commission Decision of 23.09.2011 No. 797).
- Brand: Revenue and VAT in the calculations are taken at the rate of 22% (from 01.01.2026); check the tax regime and the VAT procedure under your regime with an accountant before the first shipment. Rule: Law 425-FZ of 28.11.2025: Federal Law of 28.11.2025 No. 425-FZ (amendments to parts one and two of the Tax Code; VAT 22%).
- Retailer: Contracts with the own-label supplier and with platforms are drawn up before the first batch; check the platform economy terms and electronic document flow with a lawyer. Rule: Law 289-FZ of 31.07.2025: Federal Law of 31.07.2025 No. 289-FZ on the platform economy.
- Retailer: The name and the mark of an own label are registered before the labels and the collection are printed; check the class and territory of protection with a patent attorney.