Launch stage readiness
A condition for moving to the next stage: all critical tasks are done and not less than the set share of the others. This is the readiness of the label launch stages; model selection by gates is described in the term “Model selection by collection gates”.
Formula
Ready = all critical done and the done share ≥ the threshold
How to read
Set the gate before the stage starts: criteria written afterwards are fitted to what has been achieved.