Collection calendar (T&A)
Collection calendar (T&A): a schedule of stages from idea to warehouse with dates and owners. It shows the critical path and slack; a shift in one stage moves the date goods reach the shelf. The calendar is kept shared by all participants.
Formula
start date = warehouse date − path − buffer
How to read
Suppose goods are needed in the warehouse on 1 September, the path is 100 days and the buffer 14: start is 1 September minus 114 days = 10 May. Check the calendar after every sample: changes move the path, and the buffer must not be spent on approvals.
Where it is discussed
Topics
- Production and import
- Collection and range
- Collection calendar and materials
- Collection lifecycle and the critical path
- The planning calendar
Calculations
- Production load plan
- Payback of the digital sample (3D): savings on physical samples, weeks and the return period
- Collection calendar: critical path and slack
- Season calendar counted back from the shelf date
Documents
- Collection calendar (critical path) and lead time
- Samples and lab tests (sampling)
- Production and content: shoot budget and calendar
- Trends, DNA and trade shows: collection balance and participation payback
- Production order control: incoming fabric inspection, TNA, in-line and pre-shipment inspections, claims
- Job profiles: merchandiser and collection product manager — what they count, which documents they make, how the week works
- Job profiles: sourcing manager, PLM manager and marketplace manager — what they count and which documents they make
- The digital sample and 3D: payback, the share of replaced physical rounds and the effect on the collection calendar