Tech pack
The set of documents on a style for the factory: sketches, the bill of materials and trims, measurement points with tolerances, construction details, comments. Samples are made and the price is calculated from it.
Formula
Development per successful style = (styles in development × development per style + launched × grading) ÷ successful
How to read
A complete tech pack cuts the number of sample cycles: compare the cost of the tech pack with the cost of an extra sample.
Where it is discussed
Topics
- Collection and range
- Collection calendar and materials
- Collection lifecycle and the critical path
- Systems landscape and data exchange
Calculations
- Cost of a sample and tech pack: development cost of a style
- Collection gates (stage-gate): a funnel of hypotheses, the price of a hit, the saving against “everything into a trial” and the stop rule of the pilot batch
Documents
- Collection calendar (critical path) and lead time
- Tech pack (product technical dossier)
- Samples and lab tests (sampling)
- Fashion tech: digital product passport, RFID, AR try-on, 3D design
- Color and materials: lab dips, metamerism, hand feel, lab tests, acceptance
- Patterns, grading, fit and the technological card: from the base block to the measurement chart and tolerances
- Job profiles: merchandiser and collection product manager — what they count, which documents they make, how the week works
- Job profiles: sourcing manager, PLM manager and marketplace manager — what they count and which documents they make