Critical path
The longest chain of sequential stages: a slip in any of its stages moves the launch date.
Formula
path = the maximum total duration of chains
How to read
Stages off the path have float, stages on the path have none.
Where it is discussed
Topics
- Production and import
- Collection and range
- Collection calendar and materials
- Collection lifecycle and the critical path
- The planning calendar
- KPI dictionary and common definitions
Calculations
- Production load plan
- Payback of the digital sample (3D): savings on physical samples, weeks and the return period
- Collection calendar: critical path and slack
- Supplier OTIF and the lead-time stack
- Season calendar counted back from the shelf date
Documents
- Collection calendar (critical path) and lead time
- Samples and lab tests (sampling)
- Production and content: shoot budget and calendar
- Trends, DNA and trade shows: collection balance and participation payback
- Sewing technology and work standards: operations, time standard, cost per minute, line balance and line load
- Production order control: incoming fabric inspection, TNA, in-line and pre-shipment inspections, claims