Syntha Lab RU

Buying and supply: order, sizes, import and fabric

From a two-stage order and the size curve by cluster to landed cost and material unification.

For a brand

Open interactively →

Route steps

  1. Quick business check: two periods
    From basic figures of two periods calculates gross margin, operating profitability, turnover, days of inventory, receivables and payables, the cash cycle, the share of returns and old stock and shows which way each moved.
  2. Unit cost from the bill of materials
    Builds the unit cost from a bill of materials: materials with waste, operations by factory minutes, overhead, defects, samples, logistics and duty. Then builds the price up to the shelf and shows where each rouble comes from.
  3. First order and reserve for reorders
    Calculates what share of the plan to order at once and how much capacity to keep for a reorder after the first sales. Compares the expected profit, leftover and lost sales of a two-stage order with a single large order. The logic is our own: demand is given by scenarios, early sales remove part of the uncertainty, a reorder costs more and is limited by capacity.
  4. Size curve by store cluster and pack composition
    Splits the buy across store clusters and sizes using each cluster’s past sales, picks the composition of a ready pack (prepack) for the cluster’s curve, rounds the buy to whole packs and shows how many pieces end up in the wrong sizes. Compares a pack per cluster with one pack for the whole chain, and picking to order with a ready pack.
  5. Landed cost by style: spreading the shipment
    Splits the shared shipment costs (freight, broker, storage, tests, delivery) across styles by a chosen key (weight, volume, value or pieces), calculates duty on the customs value rather than the FOB price and shows import VAT separately. Gives the landed cost per piece and the markup over the factory price for each style.
  6. Material unification: SKUs per fabric
    Calculates how many SKUs share one fabric, how many fabrics are used in all and which of them need less than the supplier’s minimum order (excess meters and their cost). Shows how many fabrics would be enough at your target of SKUs per fabric.

Documents for this route

Other routes for this audience