From choosing a supplier to order fulfillment
The factory scorecard, the total cost of terms, the order path and OTIF.
Route steps
- Quick business check: two periods
From basic figures of two periods calculates gross margin, operating profitability, turnover, days of inventory, receivables and payables, the cash cycle, the share of returns and old stock and shows which way each moved. - Unit cost from the bill of materials
Builds the unit cost from a bill of materials: materials with waste, operations by factory minutes, overhead, defects, samples, logistics and duty. Then builds the price up to the shelf and shows where each rouble comes from. - Factory scorecard
Compares 2–4 factories on the same criteria: a weighted score, red flags and the gap between first and second place. A red flag outranks the sum: a factory with a great price and failing quality must not win. - Supplier terms: total cost of buying per unit of demand
Compares 2-4 suppliers not by list price but by total cost: minimum order and excess, a discount or retro bonus, prepayment and credit (cost of money), defects and returns, shortfall, consignment. Ranks with a risk premium. - Order path: confirmation, fill rate and lost sales
By units reconciles “ordered, confirmed, delivered, accepted”: the confirmation rate (CONF), fulfillment of what was confirmed, unit fill rate overall and on time, where most is lost and what the shortfall and lateness cost. OTIF by orders alongside. - Collection break-even and order size
Calculates how many units you must sell to recover development and launch, and shows profit at different sell-through of the run. - Cost of order mismatches and payback of the fix
Estimates the yearly cost of mismatches in order data (people’s time, returns, discounts) and how fast fixing the process pays back. - SKUs, barcodes and the labor of product cards
From the number of styles, colors and sizes calculates the number of SKUs and GTIN codes, how many cards must be created in a season, how many hours and roubles it costs and what one more color across all styles adds. - Completeness and quality of product master data
From the number of SKUs, filled cards, duplicates, invalid barcodes and stale records calculates four quality dimensions, an overall score by your weights and the cost of errors as a range. - Supplier OTIF and the lead-time stack
From supplier orders calculates the share on time, in full and both (OTIF), perfect orders, the worst supplier, average lead time planned and actual and by stage, and which stage used up the time buffer.
Documents for this route
- Production order control: incoming fabric inspection, TNA, in-line and pre-shipment inspections, claims
- Assortment matrix and assortment plan
- Supply chain due diligence: the map of links, risk by link, factory admission and a corrective plan
- Collection calendar (critical path) and lead time
- Financial condition: ratios, the Altman model with caveats and counterparty scoring
- Label launch: from an idea to the first sales — stages, documents, calculations in order and readiness criteria
- Price list and costing (landed cost)
- The production base map: countries and specializations, idea-to-shelf time, the 2+1 scheme and exchange rate sensitivity