Why this document

In wholesale money is lost not on price but on terms: a missed ship window, a cancel date, deductions for breaching the retailer’s requirements. So the wholesale manager, the logistician and the brand’s finance lead read this pack, and on the retailer side the buyer. It fixes what is ordered, when it is received and what happens if it is late or non-compliant. Without written terms a deduction arrives as a surprise and is taken from payment. The ship window, penalties and electronic data format therefore have to be agreed before the order, while the brand can still refuse.

At a glance

What is this document and why is it needed?
The wholesale document set: line sheet and price list, showroom order, ship window and cancel date, commercial terms, deductions, vendor scorecard, electronic data interchange and shipment notices. Brand and retailer see the real margin after all terms and the delivery deadlines from it.
Who owns the document and how often is it rebuilt?
Run by the brand’s wholesale director and the retailer’s buyer; the order is signed by both parties; finance checks terms (bonuses, deferral, penalties) before signing, logistics owns the delivery window.
What mistakes are the most common?
Computing margin at list and forgetting bonuses, penalties and deferral → real margin is lower by points → compute after terms. Not fixing the cancel date → the retailer cancels at season end when the fabric is already bought → fix the window and consequences of cancellation. Shipping without an ASN or with wrong carton contents → receiving costs more, penalties → an ASN for each carton and reconciliation.

For whom

Brand
The brand collects the season pre-order in the showroom: it sees demand by size and customer before production starts and fixes the price and terms. Its risks: order cancellation, late payment, chargebacks for breaking the window and packaging rules, deductions against bonuses; so it measures customer profitability after terms, not at list.
Retail
The retailer reconciles the two sides’ terms: price and margin (IMU) at list, retro-bonuses, marketing contributions, markdown support, deferral, return rights. Its risk is stock not sold at full price; the vendor scorecard shows who meets the delivery window, completeness and quality.

What it consists of

1. Line sheet and price list

  • Photo, style code, color, size run, wholesale and recommended retail price, minimum order by style and by order, availability (in stock or made to order), delivery date.

2. Order (showroom, pre-order)

  • Customer, delivery address, order number, lines (style, color, sizes, quantity, price), payment terms, ship window, cancel date, signatures.
  • Ship window: the period in which the brand must ship; cancel date: the date after which the retailer may cancel the order without consequences.

3. Commercial terms

  • Volume retro-bonus, marketing contribution, markdown support, payment deferral, return rights, price-protection and exchange procedure; all as percentages of wholesale revenue.

4. Deductions and chargebacks

  • Grounds: delivery outside the window, short shipment (fill rate), packing or labeling error, defects; penalty size in the contract, claim deadline, dispute procedure.

5. Electronic exchange and ASN

  • EDI or file: order, order confirmation, advance shipping notice (ASN), delivery note, invoice; the ASN lists the contents of every carton so receiving works by scanning, not counting.

6. Vendor scorecard

  • Retailer: On-time in-full (OTIF), completeness (fill rate), quality (defect share), ASN accuracy, share of deductions; scored by season and affecting the terms of the next order.

Electronic exchange: standards and Russian e-documents

  • International exchange: EDIFACT messages (ORDERS order, ORDRSP confirmation, DESADV despatch advice, INVOIC invoice); logistic units are labeled with a GS1 SSCC code, on which scan-based receiving against the ASN is built (general industry knowledge; messages and versions are agreed with the customer).
  • Russian circuit: the universal transfer document (UPD) and exchange through an e-document operator; align the ASN with the UPD so that carton content and the delivery note match and adjustments go through an adjustment UPD.
  • Brand: sends the customer an ASN before the truck arrives and labels cartons with SSCC; a mismatch between ASN and fact turns into a deduction.
  • Retailer: receives by scanning, matches against the ASN and UPD, records discrepancies in an act within the contract period and applies deductions only under the contract rules.

Brand and retailer: what differs in practice

  • Brand: builds the wholesale price from the retail price the retailer needs and builds customer terms into it; the list does not equal real revenue.
  • Brand: uses prepayment and deferral as a lever: a longer payment term costs more in price or less in volume.
  • Brand: builds the pre-order and seasonal shipment grid by customer so that the season does not end in a clearance at the customer.
  • Brand: budgets markdown support and returns for the customer in advance instead of discussing them after the season.
  • Retailer: counts the purchase price after all bonuses and builds the retail price from it for the target initial markup.
  • Retailer: asks for markdown support and a right to return leftovers so as not to carry the whole season risk.
  • Retailer: ties the delivery schedule to the season opening and warehouse receiving windows and counts customer fines as a buying cost.
  • Retailer: compares brands by margin and shelf turnover, not by list: terms merge into one indicator.

How to read the result and what decisions follow

  • If brand margin after terms is below target, it signals not to haggle over the list but to revisit the costliest terms: bonus, deferral, support.
  • The heat map shows that 60 days of deferral cost about 3% of shipment, like a typical retro-bonus: negotiate the term on a par with the bonus percentage.
  • Decision: the list, the bonus scale, the payment term, the support limit and return terms for the season.

Control checks

  • The sum of terms in money equals the difference between the list and net revenue and net revenue agrees with the sales ledger by customer.
  • The retail price excl. VAT equals the price incl. VAT divided by 1 plus the rate and the initial markup is computed from it.

Checklist before signing a wholesale contract (unverified: a reference, not legal advice)

  • Bonus and support terms are written with the calculation base, term and procedure; the wording discount or service is agreed with accounting.
  • The return and exchange procedure, goods condition and credit-note terms are defined and penalties are capped (unverified against the law text).
  • Shipment and accounting documents (universal transfer document, electronic document flow) are agreed and marking is transferred under the system rules (unverified).

Where the data comes from

Data sourceFields
Showroom and customer CRMorders, sizes, customers, terms, cancellation history
Contractbonuses, contributions, penalties, window, deferral, returns
Warehouse and logisticsshipping dates, completeness, ASN, delivery notes
Accountinginvoices, payments, deductions, overdue

How to build it step by step

  1. Brand: Step 1: Build the price list: wholesale price, RRP, minimum quantities; check the brand and retailer margin.
  2. Step 2: Take orders in the showroom; record the ship window and cancel date in the order.
  3. Step 3: Compute order profitability after terms (bonuses, contributions, deferral, penalties); decline the order if margin is below the threshold.
  4. Brand: Step 4: Consolidate the pre-order into the production plan; place the volume with factories leaving headroom for re-orders and allowing for cancellations.
  5. Brand: Step 5: Ship within the window with an ASN; state cartons and contents; track completeness.
  6. Retailer: Step 6: After receiving, reconcile the delivery note with the ASN; discrepancies are recorded in a report within the contractual period.
  7. Retailer: Step 7: Accrue bonuses and deductions by period; reconcile with the customer quarterly to avoid piling up disputed amounts.
  8. Step 8: After the season fill in the vendor scorecard and revise terms.

Formulas

MeasureFormulasNote
Retailer: Retailer initial markup (IMU)IMU, % = (retail price excl. VAT − wholesale price) ÷ retail price excl. VAT × 100Strip VAT from the retail price first; the wholesale price is also excl. VAT.
Brand: Brand revenue after termsNet = list − retro-bonus − marketing contribution − deductions − support − cost of deferralCost of deferral = revenue × rate ÷ 365 × days.
Brand: Fill rateFill rate, % = units shipped ÷ units ordered × 100Compute by lines and by units; the penalty is often tied to a threshold.
Brand: OTIFOTIF, % = orders delivered in the window and in full ÷ all orders × 100Define the tolerance in days and quantity in the contract.

Formulas in notation

Effective purchase price (net-net)
W_eff = W × (1 − b − m − c − s − i × t / 365)
b bonus, m marketing, c chargebacks, s support, i money rate, t deferral. Example: 90.5% of the list.
Retailer initial markup
IMU = (P_net − W) / P_net
P_net retail price excl. VAT. Example: 51.1%.
Brand result
R = Q × W_eff − Q × C
Example: RUB 1,021,540, 47.0% of net revenue.
Cost of deferral
D = S × i × t / 365
Example: RUB 53,260 at 45 days.

Worked example

An order of 1,000 units: what is left to brand and retailer after terms

LineBrand, RUBRetailer, RUB
Wholesale at list (1,000 units)2,400,000−2,400,000
Volume retro-bonus−72,00072,000
Marketing contribution−36,00036,000
Penalties and chargebacks−19,20019,200
Markdown support−48,00048,000
Cost of payment deferral−53,26053,260
Cost of goods (brand)−1,150,000
Retail sales excl. VAT (retailer)4,320,656
Result before operating costs1,021,5402,149,116

Wholesale at list is RUB 2,400,000; terms (bonus 3%, contribution 1.5%, deductions 0.8%, support 2%, 45-day deferral at 18%) take RUB 228,460. The brand result is RUB 1,021,540, margin after terms 47.0%. At a price of RUB 5,990 incl. VAT (RUB 4,910 excl. VAT) the retailer has an IMU at list of 51.1%; selling 700 units at full price and the rest with a 40% reduction gives sales of RUB 4,320,656 and a result of RUB 2,149,116 (49.7% of sales) before costs.

Figures

From the wholesale list to the brand result
Waterfall: Wholesale at list 2.4m, Retro-bonus −72k, Marketing −36k, Chargebacks −19.2k, Markdown support −48k, Cost of deferral −53.3k, Cost of goods −1.15m, Brand result 1.02m0500k1m2m2m3mWholesale at listWholesale at listWholesale at list: 2.4m2.4mRetro-bonusRetro-bonusRetro-bonus: −72k−72kMarketingMarketingMarketing: −36k−36kChargebacksChargebacksChargebacks: −19.2k−19.2kMarkdown supportMarkdown supportMarkdown support: −48k−48kCost of deferralCost of deferralCost of deferral: −53.3k−53.3kCost of goodsCost of goodsCost of goods: −1.15m−1.15mBrand resultBrand resultBrand result: 1.02m1.02mRUB
  • positive
  • negative
  • total
Data as a table
StepChangeLevel
Wholesale at list—2.4m
Retro-bonus−72k2.33m
Marketing−36k2.29m
Chargebacks−19.2k2.27m
Markdown support−48k2.22m
Cost of deferral−53.3k2.17m
Cost of goods−1.15m1.02m
Brand result—1.02m

From the wholesale list to the brand result. Wholesale shipment at the list, then customer terms and cost of goods; result before operating costs. Customer terms take 9.5% of the list; brand margin after them is 47.0%. Illustrative figures.

Cost of bonus and deferral as a percentage of shipment
Heat map: 4×5; min 0, max 9.440 d0 d30 d30 d45 d45 d60 d60 d90 d90 dBonus 0%Bonus 0%0Bonus 0% / 0 d: 01.48Bonus 0% / 30 d: 1.482.22Bonus 0% / 45 d: 2.222.96Bonus 0% / 60 d: 2.964.44Bonus 0% / 90 d: 4.44Bonus 2%Bonus 2%2Bonus 2% / 0 d: 23.48Bonus 2% / 30 d: 3.484.22Bonus 2% / 45 d: 4.224.96Bonus 2% / 60 d: 4.966.44Bonus 2% / 90 d: 6.44Bonus 3%Bonus 3%3Bonus 3% / 0 d: 34.48Bonus 3% / 30 d: 4.485.22Bonus 3% / 45 d: 5.225.96Bonus 3% / 60 d: 5.967.44Bonus 3% / 90 d: 7.44Bonus 5%Bonus 5%5Bonus 5% / 0 d: 56.48Bonus 5% / 30 d: 6.487.22Bonus 5% / 45 d: 7.227.96Bonus 5% / 60 d: 7.969.44Bonus 5% / 90 d: 9.44
  • 0 … 9.44 %
Data as a table
0 d30 d45 d60 d90 d
Bonus 0%01.482.222.964.44
Bonus 2%23.484.224.966.44
Bonus 3%34.485.225.967.44
Bonus 5%56.487.227.969.44

Cost of bonus and deferral as a percentage of shipment. Rows are the retro-bonus, columns are deferral days; each cell is the sum of the bonus and the deferral cost at a money rate of 18%.

Margin of the parties: brand after terms and retailer
Bar chart: Brand (on net revenue) 47, Retailer (on sales) 49.7, Retailer initial markup 51.10102030405060Brand (on net revenue)Brand (on netrevenue)Margin, %: 4747Retailer (on sales)Retailer (on sales)Margin, %: 49.749.7Retailer initial markupRetailer initialmarkupMargin, %: 51.151.1%
Data as a table
MeasureMargin, %
Brand (on net revenue)47
Retailer (on sales)49.7
Retailer initial markup51.1

Margin of the parties: brand after terms and retailer. One supply chain: what remains for the brand after customer terms and for the retailer from retail sales.

Specifics by category

Apparel
Apparel: seasonal pre-orders, depth by size; the delivery window and size completeness (prepack or open order) are important.
Footwear
Footwear: ordered in pairs and sizes, long cycle and tight windows; sole-attachment defects lead to deductions; returns of unsold stock under terms are more common.
Accessories
Accessories: no size grid, simpler orders, frequent top-ups and short windows; small MOQ and display sets (stands, fixtures) are agreed separately.
Kids
Kids: seasonality follows the school year and holidays, windows are tighter; certificates and marking completeness in the shipment are mandatory.
Men
Menswear: a steadier core line, more re-orders; less depth in colors, more in sizes.
Women
Womenswear: more styles, a higher fashion share and price reductions; the retailer more often demands markdown support and return rights.

Common mistakes

  • Computing margin at list and forgetting bonuses, penalties and deferral → real margin is lower by points → compute after terms.
  • Not fixing the cancel date → the retailer cancels at season end when the fabric is already bought → fix the window and consequences of cancellation.
  • Shipping without an ASN or with wrong carton contents → receiving costs more, penalties → an ASN for each carton and reconciliation.
  • Accumulating disputed deductions → unresolved receivables grow → quarterly reconciliation with the customer.
  • Size run and prepack not agreed → the retailer has holes in sizes → agree size completeness in advance.

Russian specifics

  • Supply of goods: general provisions of Ch. 30 of the Civil Code; penalty and fines by contract (Art. 330 of the Civil Code), the size and grounds are fixed in the contract. Rule: Civil Code part 2: Civil Code, part two (including Arts. 513, 713, 990, 1027).
  • Penalty and general provisions on contract: Arts. 330 and 424 of the Civil Code (part one). Rule: Civil Code part 1: Civil Code, part one (including Arts. 330, 424).
  • Restrictions on volume-based rewards for retail chains in Russia apply to food products; for apparel and footwear they do not (not verified against the law text).
  • Marking on transfer from the supplier: data on goods and shipment are passed through the marking operator; align the ASN with the transfer document. Rule: Decree 1956 of 31.12.2019: Government Decree of 31.12.2019 No. 1956 (marking rules for light-industry goods).
  • EDIFACT and GS1 (SSCC) standards are named from general knowledge and not checked against the texts; the Russian e-document circuit (UPD) is defined by the contract and the operator.

Open interactively →