Supplier pilot batch
A small batch ordered from a supplier to check the quality, sizes and terms before the full order; its results decide whether to go on with that supplier. The demand for a model is checked separately: it is a demand test with a sales threshold (the collection gates).
Formula
pilot = expected sales × 1–2 months, rounded up to the step
How to read
Set in advance what counts as success: the defect share, conformity to the sample, the lead time.
Where it is discussed
Topics
- Platforms and marketplaces
- Cost and price
- Production and import
- Collection and range
- Choosing a factory and quality
- Collection calendar and materials
- Range: width, depth and price tiers
- A payment abroad, import and export to the EAEU
- Collection lifecycle and the critical path
Calculations
- A niche and an item on a platform: capacity, competition, the newcomer’s expected sales, a pilot batch and the entry point
- Denim: fabric consumption with shrinkage, the garment price by stage and the cost of defects at washing
- Knitwear: yarn consumption, knitting and dyeing waste, the garment price by stage and a gauge-change scenario
- A trial batch at a supplier: when the trial pays off, what a mistake without it costs and at what probability of defects it breaks even
- Collection gates (stage-gate): a funnel of hypotheses, the price of a hit, the saving against “everything into a trial” and the stop rule of the pilot batch
Documents
- Choosing a niche and an item on a platform: demand, competition, the unit economics of an item, the entry point and the pilot batch
- Sourcing from China: finding and checking a supplier, a trial batch, cargo, acceptance and the full cost
- A collection roadmap by gates: hypotheses, the pilot batch, stop criteria and decisions (stage-gate)
- Launching an item in 30 days: the e-commerce route from a niche to the decision on scale