Syntha Lab RU

Supplier pilot batch

A small batch ordered from a supplier to check the quality, sizes and terms before the full order; its results decide whether to go on with that supplier. The demand for a model is checked separately: it is a demand test with a sales threshold (the collection gates).

Production and import

Open interactively →

Formula

pilot = expected sales × 1–2 months, rounded up to the step

How to read

Set in advance what counts as success: the defect share, conformity to the sample, the lead time.

Where it is discussed

Topics

Calculations

Documents

Other terms in the group

Open interactively →