Syntha Lab RU

Width and depth: budget, models and pieces

Turns a buying budget into a number of models (width) and pieces per model and per size-by-color cell (depth). Shows how many models the budget can carry at a minimum depth, what stock will be left at the end of the season and how many weeks of sales sit in stock.

Range: width, depth and price tiers For whom: Buyers and product and commercial directors planning a season.

Calculate on your data →

At a glance

What question does it answer?
How many models and how many pieces per model we can afford on this budget.
What data is needed?
Buying budget at cost and the average unit cost.
How to read the result?
On the default data a budget of 6m at 1,500 a piece gives 4,000 pieces. Over 40 models that is 100 pieces per model and 10 per size-by-color cell (400 SKUs). The budget carries up to 133 models at a minimum of 3 pieces per cell, but the factory minimum of 100 pieces limits the width to 40 models. If season sales are 3,200 pieces, 800 pieces (20%) are left and stock lasts 25 weeks against a 20-week season. Example on the default values: Pieces bought — 4,000; Depth: pieces per model — 100 pcs; Depth: pieces per size-by-color cell — 10 pcs; Width: stock-keeping units (SKU) — 400.

Why and how to reason

A buying budget can be spent in two ways: on many models in small amounts (width) or on few models in large quantity (depth). Width gives the buyer choice, but each size-by-color cell gets few pieces and the rail empties early. Depth gives size cover but the risk of betting on one model. The calculation: RUB 6,000,000 ÷ RUB 1,500 = 4,000 pieces. With 40 models that is 100 pieces per model; with 2 colors and 5 sizes there are 10 cells, so 10 pieces per cell, 400 SKUs. A minimum of 3 pieces per cell allows up to 4,000 ÷ (10 × 3) = 133 models, but the factory minimum of 100 per model limits it to 40. Expected sales of 3,200 leave 800 pieces, and cover is 4,000 ÷ (3,200 ÷ 20) = 25 weeks against a 20-week season.

When to use it

Reach for it when planning season purchase and when choosing how many models to launch. Assumptions: season sales are spread evenly over models (in life there are fewer hits and a longer tail), cost is averaged. It does not fit a capsule with a handful of models nor an order based on pre-orders, where width is dictated by orders. First set the minimum pieces per cell from real size sales.

How to read the result

Look at three numbers: pieces per cell against the minimum, the maximum models by cell and by factory minimum (take the smaller), and the leftover at season end. If a cell is below the minimum, narrow the range or cut colors and sizes. A leftover of 800 pieces (20% of the purchase) says the purchase exceeds sales: cut budget or width. The table of width options (25, 60, 90 models) shows how depth falls: at 90 models 44 pieces per model, 4.4 per cell. First decide which models are hits and get depth and which stay test items with a minimum cell: an even split of budget is almost always worse than a deliberate one.

Common mistakes

Typical trap: splitting a purchase equally across sizes (extreme sizes sell worse); ignoring the factory minimum lot; mixing retail and cost prices; taking last season’s sales without adjusting for reach. Width without depth gives empty sizes and lost sales. Do not set the cell minimum below the real batch the factory is willing to sew.

What data is needed?

  • Buying budget at cost and the average unit cost.
  • The number of models, colors and sizes; the minimum pieces in a cell.
  • Optional: season sales, its length, the factory minimum order.

Inputs

FieldUnitValue in the exampleMeaning
Buying budget at cost, excl. VAT₽6,000,000How much money you are ready to put into this part of the season.
Average unit cost excl. VAT₽1,500The average across the range; one value for all variants in the table.
Number of models (width)models40How many different models you plan to take.
Colors per modelcolors2The average across the range.
Sizes in the runsizes5How many sizes per model on average. The defaults are set for apparel. For footwear count the shares by foot length (half sizes), accessories have no size curve, for children’s use height: see the size reference. Take your own data.
Minimum pieces in a size-by-color cellpcs3Below this level a cell empties fast and the rail looks gappy. A rule of thumb, replace with yours.
Expected season sales for the whole rangepcs3,200An estimate from analogs and past seasons. Empty: stock left and weeks of cover are not calculated.
Length of the selling seasonweeks20Needed for weeks of cover. Empty: weeks of cover are not calculated.
Factory minimum order per modelpcs100From the contract or the factory correspondence. Empty: no limit.
Threshold: unsold share at which to warn%—If more is left at the season end, depth counts as too large. Empty: no threshold, the color does not change. There is no single standard in Russia: enter your own.

How it is calculated

StepFormula
Buypieces = budget ÷ average unit cost
Depthper model = pieces ÷ models; per cell = per model ÷ (colours × sizes)
Width limitmodels ≤ pieces ÷ (colours × sizes × cell minimum)
Weeks of coverpieces ÷ (season sales ÷ weeks in the season)

Worked numbers

Default values from the app; in the interactive version you enter your own.

Pieces bought
4,000
Depth: pieces per model
100 pcs
Depth: pieces per size-by-colour cell
10 pcsBelow the cell minimum the rail empties early.
Width: stock-keeping units (SKU)
400
Maximum models at the minimum cell
133Budget ÷ (cost × colours × sizes × cell minimum).
Maximum models at the factory minimum
40
Stock left at season end
800 · 20 %
Weeks of cover
25 wkIf weeks of cover exceed the season, part of the stock will be left over.

Width variants

VariantModelsPieces per modelPieces per cellSKUVerdict
Your variant4010010400enough
Narrower2516016250enough
Wider6066.76.7600below minimum
Very wide9044.44.4900below minimum

Width and depth compete for one budget: more models means fewer pieces per model. First set the cell minimum and the factory minimum, then the width.

Nuances and limits

  • More models on the same budget means fewer pieces: the rail empties early.
  • The size curve is uneven: the middle of the run needs more pieces than the edges.
  • Factory minimums limit the width before the budget does.

Terms used

Calculate on your data →