Warehouse flows: hours, staff and load by sale stage (BS, IS, AS, SO)
Calculates labor on the warehouse flows (receiving and putaway, picking and packing, returns) and shows how many people are needed in a normal month and at each stage of a sale period: before the sale (BS), in the sale (IS), after it (AS) and in the final clearance of leftovers (SO). Shows the peak, the staffing gap and the cost of an order at the peak.
At a glance
- What question does it answer?
- How many people are needed for the sale peak and the returns wave after it.
- What data is needed?
- Receiving, orders, units per order and returns in a normal month.
- How to read the result?
- A normal month needs 1,273 hours, that is 7.95 people. At the “In sale” stage 13.56 people are needed (1.70× more): 6 temporary staff. The cost of an order at the peak is 74 against 95 in a normal month because the receiving part is spread over more orders. Example on the default values: Hours in a normal month: 1,273 h; People in a normal month: 8; People at the peak: 13.6 · In sale (IS); Peak vs a normal month: 1.7×. The figures are illustrative: enter your own to see your result.
Why and how to reason
A warehouse is not one volume of work but three flows of different labor intensity: receiving and putting away, picking and packing, returns. And each changes by season stage: before the sale (BS) inbound grows, in the sale (IS) there are twice as many orders, after it (AS) the share of returns grows. So a staff sized for an average month fails at the peak. Flow hours = units × minutes ÷ 60; picking = orders × (first unit + (units − 1) × next + packing). Paid hours = sum of hours ÷ productive time share. In a normal month: receiving 360 h, picking 514 h, returns 144 h, total 1,018 h; at 80% productivity that is 1,272.5 h, or 7.95 people at 160 hours a month. At stage IS orders are 2.2 times normal and 13.56 people are needed: 1.7 times more, that is 6 temporary staff. Picking is the most labor-intensive flow (50%).
When to use it
It is useful when preparing for a sale, planning hiring and choosing between an own warehouse and an operator. It suits the warehouse of an online shop and a brand. It does not suit a case without time norms by operation: first measure them in practice. Assumptions: stages BS, IS, AS and SO (before the sale, in the sale, after it, final clearance of leftovers) are conventional, change names and multipliers; the 80% productive time share is your estimate; overtime is paid by law at least one and a half times for the first two hours, check with a lawyer.
How to read the result
First “peak to normal month”: how many times higher the load is on the heaviest stage. Then “temporary staff for the peak”: how many people must be found and trained in advance. The wave of returns arrives after the order peak so warehouse load is shifted against sales: plan for it too. If picking takes half the hours it has the largest improvement potential: pick route, zoning, packing. The cost of an order at the peak shows what the sale costs in operations. The decision: hire, agree peak capacity with an operator or shift promotions to smooth the load.
Common mistakes
Taking time norms “from books” rather than from your own warehouse. Not accounting for training temporary staff: a newcomer works at half pace in the first days. Forgetting returns after a sale. Assuming people work 100% of the time: breaks, moves and idle time reduce productive time.
What data is needed?
- Receiving, orders, units per order and returns in a normal month.
- Minutes per operation, productive time, hours per person, cost of an hour.
- Multipliers of the stages BS, IS, AS, SO from past sales.
Inputs
| Field | Unit | Value in the example | Meaning |
|---|---|---|---|
| Receiving | pcs | 12,000 | Units a month from suppliers. |
| Orders | orders | 6,000 | Shipped orders a month. |
| Units per order | pcs | 1.8 | Average units per order. |
| Returns, share of units | % | 20 | In a normal month. The share by stage is set in the table. |
| Receiving a unit | min | 1.2 | Unloading, counting, checking, labeling-code control. An example: enter your own data, there is no single standard in Russia. |
| Putaway of a unit | min | 0.6 | Moving to a bin and booking in the system. An example: enter your own data, there is no single standard in Russia. |
| Picking the first unit of an order | min | 3 | Travel through the warehouse and picking. An example: enter your own data, there is no single standard in Russia. |
| Picking each further unit | min | 0.8 | Empty or 0: independent of the number of units. |
| Packing an order | min | 1.5 | Packing, label, handover to the carrier. An example: enter your own data, there is no single standard in Russia. |
| Processing a returned unit | min | 4 | Receiving, checking, cleaning, photo, putaway. An example: enter your own data, there is no single standard in Russia. |
| Productive time | % | 80 | The share of paid time without idling and breaks. An example: enter your own data, there is no single standard in Russia. |
| Hours per person a month | h | 160 | The norm under the production calendar at a 40-hour week (art. 91 of the Labor Code); the hours of a month are in the production calendar. Reference as of 13.11.2026; check with a lawyer. |
| Cost of a warehouse hour | ₽ | 450 | Pay with contributions per hour. See “Payroll and the full cost of an employee” for how to calculate. An example: enter your own data, there is no single standard in Russia. |
| Permanent warehouse headcount | people | — | Optional. How many people are on the warehouse payroll: the calculation shows the staff load at the peak and in a normal month (see the “Warehouse capacity” calculation). Empty: not counted. |
How it is calculated
| Step | Formula |
|---|---|
| Flow hours | units × minutes ÷ 60; picking = orders × (first + (units − 1) × next + packing) |
| Paid hours | sum of the flows’ hours ÷ productive share |
| People | paid hours ÷ hours per person a month |
Worked numbers
Default values from the app; in the interactive version you enter your own.
- Hours in a normal month
- 1,273 h
- People in a normal month
- 8Hours ÷ hours per person; round up in practice.
- People at the peak
- 13.6 · In sale (IS)
- Peak vs a normal month
- 1.7×How many times higher the need is at the busiest stage.
- Temporary staff for the peak
- 6 peopleWhole people at the peak minus whole people in a normal month.
- Cost of an order at the peak
- 73.96 ₽ · in a normal month 95.44 ₽
- The most labour-intensive flow
- 50.5 % · Picking and packingThe flow’s share of the hours of a normal month.
Load by stage
| Stage | Orders | Returned, pcs | Hours | People | Labour cost | Per order |
|---|---|---|---|---|---|---|
| Before sale (BS) | 5,400 | 1,944 | 1,325 | 8.3 | 596,363 ₽ | 110.44 ₽ |
| In sale (IS) | 13,200 | 4,752 | 2,170 | 13.6 | 976,275 ₽ | 73.96 ₽ |
| After sale (AS) | 6,000 | 3,780 | 1,183 | 7.4 | 532,125 ₽ | 88.69 ₽ |
| Final clearance (SO) | 9,000 | 4,050 | 1,436 | 9 | 646,313 ₽ | 71.81 ₽ |
At the “In sale (IS)” stage 13.6 people are needed against 8 in a normal month: find and train 6 temporary staff before the peak or agree peak capacity with an operator.
The stages BS, IS, AS and SO (before the sale, in the sale, after it, the final clearance of leftovers) are conventional: in your company they may be named differently, so change the names and multipliers. The wave of returns comes after the order peak, so the warehouse load is shifted relative to sales.
Overtime is paid at not less than one and a half times for the first two hours and not less than double after that (art. 152 of the Labour Code, reference as of 13.11.2026); for a peak temporary staff are usually cheaper than overtime. Check with a lawyer.
Empty = 0 in the fields: Permanent warehouse headcount. If that is not the case, fill them in: the result will change.
Nuances and limits
- The stages are named conventionally: in your company they may be named differently.
- Take operation times from measurements, not from the example.
- The wave of returns comes after the order peak.