Warehouse slotting by ABC: a shorter picking path

Compares the average picking path with a random layout (goods spread evenly over zones) and with an ABC layout (fast goods closer to the exit). From the share of time spent walking it gets the picking time saving, the hours and rubles per year and the payback of the re-slotting costs.

Warehouse, fulfillment and the last mile For whom: Warehouse heads and logistics operators.

Calculate on your data →

At a glance

What question does it answer?
How much the picking path shrinks with an ABC layout.
What data is needed?
Zones: distance and line shares.
How to read the result?
The path reduction, then hours and the payback of re-slotting. Example on the default values: Path at a random layout: 26.7 m; Path at an ABC layout: 18 m; Path reduction: 32.5%; Picking time reduction: 16.3%. The figures are illustrative: enter your own to see your result.

Why and how to reason

If fast goods lie in the near zones the path is shorter. In the example a random layout gives 26.7 m, ABC 18.0 m (−32.5%), picking time falls by 16.3%.

When to use it

Before re-slotting a warehouse and a season.

How to read the result

The path reduction, the hours and the re-slotting payback.

Common mistakes

ABC was not updated before the season; the share of walking by eye; re-slotting costs forgotten.

What data is needed?

  • Zones: distance and line shares.
  • Share of walking, lines per day, rate.

Inputs

FieldUnitValue in the exampleMeaning
Share of walking in picking time%50What part of the time the picker walks rather than takes and puts. Measure it by timing. The example value is illustrative.
Order lines per daylines3,000How many lines (items) are picked per working day. The example value is illustrative.
Working days per yeardays250The warehouse working days per year. The example value is illustrative.
Time per line at a random layoutsec60The average time to pick one line as a whole, seconds. The example value is illustrative.
Cost of an hour₽400An hour of the picker with contributions. The example value is illustrative.
Re-slotting costs (one-off)₽300,000Work hours, downtime, relabeling cells. The example value is illustrative.

How it is calculated

StepFormula
Random layoutthe sum of cell share × distance
ABC layoutthe sum of line share × distance
Path reduction1 − ABC ÷ random
Timepath reduction × the share of walking
Saving per yearlines per day × days × time per line × time reduction ÷ 3600 × hourly rate

Worked numbers

Default values from the app; in the interactive version you enter your own.

Path at a random layout
26.7 m
Path at an ABC layout
18 m
Path reduction
32.5 %
Picking time reduction
16.3 %Path reduction × the share of walking.
Hours saved per year
2,031 h
Saving per year
812,500 ₽
Re-slotting payback
4.4 months
Average picking path, m
Bar chart: Random layout 26.7, By ABC 18051015202530Random layoutRandom layoutPath: 26.726.7By ABCBy ABCPath: 1818
Data as a table
MeasurePath
Random layout26.7
By ABC18

Zones

ZoneDistanceShare of lines by ABCShare of cells
Zone A1060 %33 %
Zone B2530 %33 %
Zone C4510 %33 %

What to do with the result: move the most demanded lines to the near zones but update ABC before the season: at the peak the set of fast items changes.

A typical mistake: not updating ABC before the season and estimating the share of walking by eye. The calculation is useful for a brand warehouse and a logistics operator; look at the order cost and hours in the “Warehouse unit economics” and “Warehouse flow” calculations.

Nuances and limits

  • Not updating ABC before the season.
  • Estimating walking by eye.
  • Forgetting re-slotting costs.

Terms used

Calculate on your data →