Syntha Lab RU

Factory capacity load

Order minutes at standard times ÷ available factory minutes per month

Open interactively →

Formula
Order minutes at standard times ÷ available factory minutes per month
Unit
%
Aggregation rule
Ratio of sums
Source system
PLM and production records
Owning role
Head of production / sourcing
Frequency
Monthly

Passport

Grain
Workshop or line × month
Numerator
Order minutes at standard times
Denominator
Available workshop minutes per month
At zero or no data
No available minutes: “—”.
Limits
Minutes at product standards, not actuals. Available minutes account for days off, repairs and downtime. A load above 100% is an overload, not an error.
Check example
Order minutes: 18000; Available minutes: 24000. a/b*100. Result: 75.0%
Related metrics

Version 1.0 · valid from 2026-11-16 · checked 2026-11-16

Related pages

Definition

Capacity is the standard minutes a factory delivers a month; load is the share of capacity taken by orders.

A load above 100% means orders do not fit the deadline without overtime or new workers.

Open interactively →