Factory capacity load
Order minutes at standard times ÷ available factory minutes per month
- Formula
Order minutes at standard times ÷ available factory minutes per month- Unit
- %
- Aggregation rule
- Ratio of sums
- Source system
- PLM and production records
- Owning role
- Head of production / sourcing
- Frequency
- Monthly
Passport
- Grain
- Workshop or line × month
- Numerator
- Order minutes at standard times
- Denominator
- Available workshop minutes per month
- At zero or no data
- No available minutes: “—”.
- Limits
- Minutes at product standards, not actuals. Available minutes account for days off, repairs and downtime. A load above 100% is an overload, not an error.
- Check example
- Order minutes: 18000; Available minutes: 24000.
a/b*100. Result: 75.0% - Related metrics
Version 1.0 · valid from 2026-11-16 · checked 2026-11-16
Related pages
- Term: Production capacity and load
- Calculation: Production load plan
Definition
Capacity is the standard minutes a factory delivers a month; load is the share of capacity taken by orders.
A load above 100% means orders do not fit the deadline without overtime or new workers.