Starting price, price floor and bid reduction
The starting maximum price of a contract sets the ceiling. The price floor is cost with the target margin and the cost of security; the reduction is counted from the starting price.
Formula
Floor = cost ÷ (1 − margin); reduction = 1 − floor ÷ starting price
How to read
Check the procurement requirements at the date.