Syntha Lab RU

Cost of quality to revenue

(Prevention + appraisal + internal failure + external failure) ÷ revenue for the period

Open interactively →

Formula
(Prevention + appraisal + internal failure + external failure) ÷ revenue for the period
Unit
%
Aggregation rule
Ratio of sums
Source system
ERP and accounting system; PLM and production records
Owning role
Head of production / sourcing
Frequency
Monthly

Passport

Grain
Period × brand or factory; four categories of quality cost
Numerator
Cost of quality: prevention + appraisal + internal + external failure, RUB
Denominator
Revenue for the same period excl. VAT, RUB
At zero or no data
No revenue: show “—”.
Limits
External failure includes returns, exchanges and claims: a zero external failure usually means it was not counted. The period of costs and revenue is the same.
Check example
Cost of quality, RUB: 7800000; Revenue, RUB: 120000000. a/b*100. Result: 6.5%

Version 1.0 · valid from 2026-11-16 · checked 2026-11-16

Related pages

Definition

Internal failure (before shipment) plus external failure (returns, claims, exchange). Together with prevention and appraisal it gives the cost of quality.

Count customer returns, not only workshop defects.

Open interactively →