Service level
Service level: the probability that goods are in stock when a customer wants to buy them within a replenishment cycle. It is set as a target by item class and determines the safety stock multiplier in the calculation. It is measured in per cent.
Formula
Set as a goal; in the safety stock formula it maps to the factor z
How to read
Raising the level from 95% to 99% noticeably increases stock: with demand variability of 10 units a day and a 9-day period, safety stock grows from 49.5 to 70 units. Set a high level only for fast items and lower it for the tail, otherwise money goes into leftover stock.
Where it is discussed
Topics
- Replenishment and stock cover
- Order size and break-even
- Stock accuracy, shrink and availability
- Store staff and productivity
Calculations
- Reorder point and safety stock
- Safety stock by fill rate and lead-time variability
- Safety stock from forecast error
- How much to order under uncertain demand
- Availability and lost revenue
- Queue M/M/c: how many tills and assistants are needed at the peak