Normal loss function
Expected shortage in units of the spread when stock equals z spreads above the mean. Needed for the fill rate and seasonal buying.
Formula
G(z) = φ(z) − z × (1 − Φ(z))
How to read
Expected shortage = spread × G(z). The higher z, the faster G falls: the last percents of protection are expensive.
Where it is discussed
Topics
- Replenishment and stock cover
- Forecast and budget
- Order size and break-even
- Stock accuracy, shrink and availability
- Scenarios and plan stress test