Demurrage
A charge to the carrier or the terminal for a loaded container staying at the terminal beyond the free time; the rate usually rises in steps.
Formula
Σ over the days beyond the term of the step rate of the day
How to read
Count by the offer: the sum is unrelated to the price of the shipping itself and grows fast after the first step.