Syntha Lab RU

Profit bridge: full-price sales growth and flow-through

Shows what the next period’s profit is made of: full-price sales growth is multiplied by the share that reaches profit (flow-through), then cost growth is subtracted and savings added. If the actual profit is known, it computes the actual share.

Revenue, profit and costs For whom: Finance directors and owners building a profit forecast for the next period.

Calculate on your data →

At a glance

What question does it answer?
What profit results if full-price sales grow and costs grow too, and what share of the sales growth reaches profit.
What data is needed?
Profit of the base period and the growth of full-price sales excl. VAT.
How to read the result?
On the example base profit is 120m, full-price sales growth 250m and the share 30%. That is +75m of profit; cost growth and savings give −15m (−18, −6 and +9). Profit by the bridge is 180m, 50% above the base; each rouble of sales growth brings 0.24 of profit. Example on the default values: Next-period profit by the bridge: RUB 180 million; Profit growth from full-price sales: RUB 75 million; Costs: growth and savings, total: −RUB 15 million; Change in profit against the base: 50%. The figures are illustrative: enter your own to see your result.

Why and how to reason

Sales growth is not profit growth: of each extra rouble of revenue only part reaches profit, because cost, commission and variable expenses eat the rest. That part is called flow-through. The bridge is built like this: base profit + full-price sales growth × share + savings − cost growth. In the example the base is 120 million, sales growth of 250 million at a 30% share gives +75 million; costs: staff −18 million, rent −6 million, logistics +9 million, total −15 million. Next-period profit is 120 + 75 − 15 = 180 million, up 50%. Each rouble of sales growth brings 0.24 of profit: (180 − 120) ÷ 250. If actual profit is known the share is recovered backwards: (actual − base − costs) ÷ sales growth. That is how you learn from the past period rather than guess.

When to use it

It is meant for budget planning and explaining profit to an investor when sales growth is given and you must show what remains. It also checks an ambitious plan: is the share enough to cover cost growth. It does not suit a sharp change in cost structure or when sales growth comes with discounts (then the share is lower). Assumptions: the flow-through share is constant within the period and growth is counted at full price excluding VAT.

How to read the result

See what the change is made of: if sales growth brings 75 million and costs eat 15, 20% of the gain goes to expenses. Compare profit per rouble of growth with current profitability: if lower, growth comes with a worse margin than the business as a whole. Compare the actual share with the set one: a gap above 5 pp means the share in the plan should be revisited. If cost growth exceeds profit from growth, sales growth is pointless without changing costs. Next check volume and the gross margin bridge.

Common mistakes

Mixing up signs: cost growth is entered with a minus, savings with a plus. Taking the share from another business: it depends on your cost structure. Counting growth at the discounted price: then the share is overstated. One more mistake: recording the same item twice, for example in both the share and the costs, and getting an inflated profit.

What data is needed?

  • Profit of the base period and the growth of full-price sales excl. VAT.
  • The share of the growth that reaches profit: your own estimate from past periods.
  • Cost growth with a minus and savings with a plus.

Inputs

FieldUnitValue in the exampleMeaning
Profit of the base period₽120,000,000Operating or pre-tax: what matters is that the measure is the same in both periods.
Growth of full-price sales excl. VAT₽250,000,000Amount excl. VAT: the general rate is 22% from 01.01.2026. The rate follows the shipment date; confirm your regime and rate with an accountant.
Share of the growth that reaches profit%30Your own estimate: the part of the sales growth left after purchase, commissions and delivery. Take it from past periods: profit growth ÷ full-price sales growth. There is no single standard in Russia; 30 here is an example.
Actual profit of the current period₽—Optional. Needed to see the actual share.

How it is calculated

StepFormula
Profit by the bridgebase + full-price growth × share + savings − cost growth
Actual share(actual profit − base − costs) ÷ sales growth

Worked numbers

Default values from the app; in the interactive version you enter your own.

Next-period profit by the bridge
180 m ₽
Profit growth from full-price sales
75 m ₽
Costs: growth and savings, total
−15 m ₽
Change in profit against the base
50 %
Profit per rouble of sales growth
0.2The total change in profit ÷ full-price sales growth.
Profit bridge: what the gain is made of
Waterfall: Full-price sales growth +75m, Growth of staff costs −18m, Growth of rent −6m, Savings on logistics +9m, Total change 60m020m40m60m80mFull-price sales growthFull-price salesgrowthFull-price sales growth: +75m+75mGrowth of staff costsGrowth of staffcostsGrowth of staff costs: −18m−18mGrowth of rentGrowth of rentGrowth of rent: −6m−6mSavings on logisticsSavings on logisticsSavings on logistics: +9m+9mTotal changeTotal changeTotal change: 60m60m₽
  • positive
  • negative
  • total
Data as a table
StepChangeLevel
Full-price sales growth+75m75m
Growth of staff costs−18m57m
Growth of rent−6m51m
Savings on logistics+9m60m
Total change—60m

Profit bridge

TermAmount
Base profit120 m ₽
Full-price growth × share75 m ₽
Growth of staff costs−18 m ₽
Growth of rent−6 m ₽
Savings on logistics9 m ₽
Profit by the bridge180 m ₽

The share that reaches profit depends on the cost structure and changes: check it on your own past periods, not on other people’s numbers.

Nuances and limits

  • The share that reaches profit changes with the cost structure: take it from your own periods.
  • Do not mix full-price sales and sales on discount.
  • Enter costs as amounts; do the scaling to volume yourself.

Terms used

Calculate on your data →