Safety stock
Safety stock: a reserve for a demand spike or delivery delay. It depends on service level, demand variability and lead time with the review period; the higher the target and variability, the larger the stock and the costs.
Formula
z × demand variability × √(lead time + review period)
How to read
Suppose z = 1.65 (about 95%), demand variability 10 units a day and lead time plus review period 9 days: 1.65 × 10 × √9 = 49.5 units. Raising the target from 95 to 99% (z = 2.33) lifts stock to 70 units.
Where it is discussed
Topics
- Replenishment and stock cover
- Stock accuracy, shrink and availability
- Working with stock: transfers, top-up, defects, prices, order entry
Calculations
- Reorder point and safety stock
- Safety stock by fill rate and lead-time variability
- Intermittent demand: Croston and SBA for rare sizes and accessories
- Safety stock from forecast error
- Allocating a stock among stores: by demand and limits against the proportional
Documents
- Stock turnover and dead stock
- Safety stock, service level and newsvendor: how much to hold and how much to order
- ABC-XYZ and Pareto: calculation, thresholds, link to safety stock and the range
- Reader question: how to count safety stock for rare sizes when demand is not normal
- The weekly buying tape: weeks of supply, clean rate of sale, safety stock and the season reforecast