Syntha Lab RU

Safety stock

Safety stock: a reserve for a demand spike or delivery delay. It depends on service level, demand variability and lead time with the review period; the higher the target and variability, the larger the stock and the costs.

Stock and buying

Open interactively →

Formula

z × demand variability × √(lead time + review period)

How to read

Suppose z = 1.65 (about 95%), demand variability 10 units a day and lead time plus review period 9 days: 1.65 × 10 × √9 = 49.5 units. Raising the target from 95 to 99% (z = 2.33) lifts stock to 70 units.

Where it is discussed

Topics

Calculations

Documents

Dictionary measure

Other terms in the group

Open interactively →