Reorder point
Reorder point: the stock level at which a new order must be placed with the supplier. It is demand over the lead time plus safety stock; the balance is counted together with goods already in transit, otherwise the top-up goes out twice.
Formula
Demand × lead time + safety stock
How to read
Suppose 20 units sell a day, the lead time is 10 days and safety stock is 60 units: the reorder point is 20 × 10 + 60 = 260 units. When the balance together with inbound drops to 260, it is time to order. A common error is taking the lead time without allowing for delays.