Syntha Lab RU

Croston method and SBA

A forecast of intermittent demand: the demand size and the interval between sales are smoothed separately, the forecast is their ratio; SBA reduces over-forecasting.

Forecast and data

Open interactively →

Formula

Forecast = size ÷ interval; SBA: (1 − α ÷ 2) × size ÷ interval

How to read

Suits rare sizes and accessories; gives average demand and not safety stock.

Where it is discussed

Topics

Calculations

Other terms in the group

Open interactively →