Readiness for EU requirements: scores by block, hours and cost to close, an illustrative EPR fee per item
Splits the preparation for selling in the EU into weighted blocks: item data, traceability, chain check, a responsible person, claims, leftovers. For each block you set readiness, a stop minimum and hours of work from scratch. The calculation gives a total score, the blocks below the minimum, the hours and cost of closing the gaps and an illustrative extended-producer-responsibility fee per item. It is a planning tool for preparation, not a legal assessment: check the deadlines and duties of the EU acts against their text (see the calculation “EU rules for exporters”).
At a glance
- What question does it answer?
- How ready you are by block, which block stops the decision, how many hours and how much money closing the gaps takes and how much an illustrative EPR fee will add to the price of an item.
- What data is needed?
- Preparation blocks with weights, readiness in fact, a stop minimum and hours of work from scratch.
- How to read the result?
- Example on the default values (eight blocks, a threshold of 80%, 600 items to the EU, 0.9 kg, an illustrative rate of RUB 40/kg): total readiness 52.3%, blocks below the minimum 1, decision: stop: close the blocks below the minimum; close first: “Responsible person in the EU: product safety and the EPR scheme”. Full readiness takes 178 h, or RUB 267,000; the EPR fee is RUB 21,600 a year, RUB 36 per item. Example on the default values: Total readiness: 52.3%; Blocks below the minimum (stop): 1; Decision: stop: close the blocks below the minimum; What to close first: Responsible person in the EU: product safety and the EPR scheme. The figures are illustrative: enter your own to see your result.
Why and how to reason
An EU partner does not ask “are you ready at all” but specifically: what the item is made of, where and by whom, who answers for it in the EU, whether you have a chain check. So the preparation is split into blocks, each gets a weight and an honest readiness in fact: there is a document or there is not. The total score is a weighted sum, but one failure matters more than the average: a block can have a stop minimum, and until it is closed the answer “ready” is impossible. A block’s hours from scratch are multiplied by the share not done and give time and cost. Example: a score of 52.3%, blocks in stop 1, close first “Responsible person in the EU: product safety and the EPR scheme”; full readiness takes 178 h, or RUB 267,000.
When to use it
The calculation is needed before the first contract with a buyer from the EU, when you receive a supply chain questionnaire, before a partner’s buying season and when planning the compliance budget. It does not determine whether you are obliged by law: the circle of those obliged and the dates are read in the acts (ESPR, the extended producer responsibility directive, the forced labor regulation, the directive on environmental claims). For footwear and leather add blocks on materials and tanning, for children’s on item safety, for accessories on trims and coatings.
How to read the result
Look at three numbers in this order: blocks in stop (1), the total score against the threshold, then the hours. If there is a stop, the rest can wait: close it first. If there are no stops but the score is below the threshold, take the blocks with the most points lost per hour of work. The EPR fee in the example is RUB 36 per item, 0.6% of the price excluding VAT: by itself it is small, but the rate is illustrative and the schemes are still being built. Count it as a range, not as a price. If the hours needed exceed what the team can allot in a quarter, revise the order or bring in a contractor.
Common mistakes
The first error: setting readiness “by intention”. The second: not setting a stop minimum and being glad of the average score. The third: treating the EPR fee as known and building it into the price as a fact. The fourth: taking the calculation for a legal assessment: it puts the work in order but does not replace checking the acts.
What data is needed?
- Preparation blocks with weights, readiness in fact, a stop minimum and hours of work from scratch.
- Supplies to the EU: units, mass of an item, the scheme fee rate (illustrative until the national schemes start).
- The cost of an hour, hours a week for preparation and a readiness threshold set in advance.
Inputs
| Field | Unit | Value in the example | Meaning |
|---|---|---|---|
| Units to the EU a year | units | 600 | How many items a year you sell into the EU directly or through partners. The example value is illustrative. |
| Mass of one item | kg | 0.9 | The mass of an item with or without packaging: check which basis the scheme of your EU country uses once it works. The example value is illustrative. |
| EPR scheme fee rate | ₽/kg | 40 | An illustrative rate per kilogram: real scheme tariffs appear after the national systems start, take it from the operator of your country. The example value is illustrative. |
| Item price excluding VAT | ₽ | 6,000 | The price of one item excluding VAT to which the fee is compared: the share of the fee in the price. The example value is illustrative. |
| Cost of an hour of work | ₽ | 1,500 | The average hourly cost of your employee or contractor with contributions: it values the closing of gaps. The example value is illustrative. |
| Hours a week for preparation | h/week | 20 | How many hours a week the team can really allot: the weeks to close are counted from it. The example value is illustrative. |
| Readiness threshold | % | 80 | The total score from which you consider yourself ready to answer EU partners. Set the threshold before scoring the blocks. The example value is illustrative. |
How it is calculated
| Step | Formula |
|---|---|
| Total readiness | Σ weight × block readiness ÷ Σ weights |
| Stop | a minimum is set and the block readiness is below it |
| Hours to close | Σ hours from scratch × (1 − readiness) |
| Cost and time | hours × hourly rate; hours ÷ hours a week |
| EPR fee (illustrative) | units × mass × rate per kg; per item and as a share of the price excluding VAT |
Worked numbers
Default values from the app; in the interactive version you enter your own.
- Total readiness
- 52.3 %
- Blocks below the minimum (stop)
- 1
- Decision
- stop: close the blocks below the minimum
- What to close first
- Responsible person in the EU: product safety and the EPR scheme
- Hours to full readiness
- 178 h
- Cost of closing the gaps
- 267,000 ₽
- Weeks to close
- 8.9 wk
- Mass of the yearly supply to the EU
- 540 kg
- EPR fee a year (illustrative rate)
- 21,600 ₽
- EPR fee per item
- 36 ₽
- Fee in the price excluding VAT
- 0.6 %
- Readiness
- Stop minimum
Data as a table
| Measure | Readiness | Stop minimum |
|---|---|---|
| Fiber content and mass for every item | 70 | 50 |
| Country and factory for every item | 60 | 50 |
| Material certificates and test reports | 50 | 0 |
| Chain check: code of conduct, audits, forced-labor risk | 40 | 30 |
| Responsible person in the EU: product safety and the EPR scheme | 25 | 30 |
| Environmental claims are backed by data | 80 | 0 |
| Leftovers and their fate: store, sell, donate | 60 | 0 |
| An owner and a routine for answering EU partners’ requests | 50 | 0 |
Data as a table
| Measure | Hours |
|---|---|
| Fiber content and mass for every item | 12 |
| Country and factory for every item | 24 |
| Material certificates and test reports | 25 |
| Chain check: code of conduct, audits, forced-labor risk | 72 |
| Responsible person in the EU: product safety and the EPR scheme | 22.5 |
| Environmental claims are backed by data | 4 |
| Leftovers and their fate: store, sell, donate | 6 |
| An owner and a routine for answering EU partners’ requests | 12.5 |
Preparation blocks
| Block | Weight, % | Readiness, % | Points lost | Hours to close | Status |
|---|---|---|---|---|---|
| Fiber content and mass for every item | 15 | 70 | 4.5 | 12 | in progress |
| Country and factory for every item | 15 | 60 | 6 | 24 | in progress |
| Material certificates and test reports | 10 | 50 | 5 | 25 | in progress |
| Chain check: code of conduct, audits, forced-labor risk | 20 | 40 | 12 | 72 | in progress |
| Responsible person in the EU: product safety and the EPR scheme | 15 | 25 | 11.3 | 22.5 | stop |
| Environmental claims are backed by data | 10 | 80 | 2 | 4 | in progress |
| Leftovers and their fate: store, sell, donate | 5 | 60 | 2 | 6 | in progress |
| An owner and a routine for answering EU partners’ requests | 10 | 50 | 5 | 12.5 | in progress |
1 block(s) are below the minimum: Responsible person in the EU: product safety and the EPR scheme. Until they are closed a high total score means nothing: an EU partner will ask exactly about them.
The scores and hours are set by you: the calculation puts the work in order but does not assess whether you comply with an act. Check the deadlines and the circle of those obliged against the acts (ESPR, the extended producer responsibility directive, the forced labor regulation, the directive on environmental claims, the reporting and due diligence directives). For footwear, accessories and children’s the set of blocks is its own: safety and documents for children’s, materials and leather for footwear and bags, and the mass and the scheme rate differ.
Nuances and limits
- Scoring readiness by intention: “in progress” is not “the document is held”.
- Not setting a stop minimum and being glad of the average score: a partner will ask about the weakest block.
- Treating the EPR fee as known: the schemes are still being built, the rate is illustrative and may depend on material and repairability.